Development Description
The development principally consists of: the demolition and removal of the existing 1 No. storey clubhouse (190.1 sq m) and hard-surfacing; the realignment and resurfacing of the northern Senior Pitch (Pitch No. 1), which is to be partially enclosed by a 990 millimetre high spectator railing on its western and northern sides; and the construction of a new 2 No. storey clubhouse (approx. 745.6 sq m). The clubhouse notably includes: changing rooms; gym; south-east facing, first-floor terrace; rooftop solar panels; a digital score board; and 2 No. logos (signage). In addition, the development proposes the provision of: a shed building (approx. 185.6 sq m) with an immediate, meanwhile use as a gym, to be changed to maintenance and storage use upon completion of the clubhouse; 61 No. car parking spaces (including mobility impaired and EV charging spaces); coach and mini bus parking; 103 No. cycle parking spaces; 8 No. new floodlights ranging in height from 18 metres to 20 metres; public lighting; generator; new goal posts and 12 metre high retractable ball-stop netting in 2 No. locations; hard and soft landscaping; and all associated site and development works above and below ground. A Natura Impact Statement has been prepared in respect of the proposed development
Map
No coordinates supplied in the public planning feed.