Save to pipeline

Commercial fit-out · Co. Dublin

No. 1 Grand Canal Quay, Dublin 2 and No. 2 Grand Canal Quay, Dublin 2

Granted 16 Mar 2023

Council register

The council's register shows: Granted on 16 Mar 2023.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Development will consist of

The development will consist of: Alterations to a previously approved development (Reg. Refs. 3752/21 and 4154/22) which provided for the demolition of the existing vacant warehouse structure at No. 2 Grand Canal Quay (2,241 sq.m) and the construction of a part 8 to part 15 storey (proposed 8-storey element facing west and proposed 15-storey element facing Grand Canal Quay to the east), over basement level, contemporary glazed office building. The alterations to the previously approved scheme (Reg. Ref. 3752/21 and Reg. Ref. 4154/22) include the following: (i) the addition of 2 no. floor levels of office space atop the approved 8-storey rear block to the west to now provide for a part 10 storey to part 15 storey office building; (ii) relocation of the approved 8th floor roof terrace to the proposed 10th floor level and the provision of revised landscaping to same; (iii) the addition of PV panels on an elevated structure at the 10th floor level roof space; (iv) an increase in the floor area of the approved building to the north and west from 3rd to 9th floor level (from 7,993 (approved) to 9,345 sq.m (proposed)); (v) reduction in size (from 176sq.m to 97sq.m) and reconfiguration of proposed winter garden at 13th floor level; (vi) revised 14th roof plan including the addition of PV panels on an elevated structure at roof level, amendments to the approved recessed roof top plant enclosure, the removal of the previously approved rooflights, and a revised parapet detail; (vii) the provision of integrated PV panels to the eastern elevation from 3rd floor level to 14th floor level, on the southern elevation from 8th floor level to 14th floor level, and on the western elevation from 10th floor level to 14th floor level. Proposed internal modifications include: (viii) revisions to the basement level layout to provide for a minor increase to the basement footprint to the north-east and south-west, revisions to the plant room layout, and the inclusion of an accessible toilet; (ix) internal alterations at ground floor level including a revised entrance hall arrangement and minor amendments to stair core 01 and stair core 02. The front (eastern) building line has been moved further east, in line with No. 1 Grand Canal Quay to the south; (x) removal of 1st floor mezzanine level, and associated spiral stairs and lift and minor alterations to stair core 01 and stair core 02; (xi) removal of 14th floor mezzanine level and associated spiral stair; (xii) minor revisions to the northern elevation including a revised soffit detail. The above amendments result in an increased overall floor area of 18,723sq.m including basement level. The development also includes drainage, revised landscaping at ground floor level, boundary treatments and all associated site development and ancillary works necessary to facilitate the development including lighting and signage.

Location
Dublin 2, Co. Dublin Map
Planning reference
5299/22
Get alerts

Key facts

Floor area
18,723 m²
Project type
Commercial fit-out
Received
28 Nov 2022
Granted
16 Mar 2023
Site start
27 Nov 2023

Timeline

  1. Application received
  2. Granted
  3. Site start

Outlook

What happens next

Work started on site on 27 Nov 2023, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Work packages named so far

  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference 5299/22.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 27 Nov 2023Work started · Extension to building previous notified under 7-Day Notice...

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 2

Get alerts for Dublin 2Free. We email you when new applications appear.

Free email alerts

Get new Dublin 2 projects by email

New planning applications, decisions and site starts in Dublin 2, Co. Dublin. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Email alerts for this applicationMore alert options