Temporary/event · Co. Dublin
Site to the north of The Clock Tower, Grangegorman Lower, Dublin 7
Granted 19 Feb 2021
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 7 by email
Key facts
- Planning application GSDZ4003/20 at Site To The North of The Clock Tower, Grangegorman Lower, Dublin 7: There are several Protected Structures within the Grangegorman SDZ.
- It was received by Dublin City Council on 18 Dec 2020.
- Status: Granted 19 Feb 2021.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 7 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 19 Feb 2021.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
There are several Protected Structures within the Grangegorman SDZ
PERMISSION & RETENTION: We, Technological University Dublin (TU Dublin) intend to apply for permission and retention permission for development at this site: at a warehouse to the north of The Clock Tower (a Protected Structure, RPS Ref. 3288), Grangegorman Lower, Dublin 7. The site is located within the overall Grangegorman Strategic Development Zone (SDZ) of c. 28.69 ha at Grangegorman, Dublin 7. There are several Protected Structures within the Grangegorman SDZ. The temporary development will consist of: A) Retention permission for works comprising of: 1. Metal corrugated cladded gable end (east elevation) to enclose a warehouse of 835 sq.m GFA (original warehouse partially demolished under Reg.Ref. 3336/12; reducing from c. 2,018 sq.m to 835 sq.m GFA). B) Permission for works comprising of: 1. Refurbishment works to an existing warehouse consisting of: i) Replacement of the existing asbestos cladding on the north, south and west elevation with a new metal corrugated cladding facade; ii) Blocking up of existing roller shutter doors and selected pedestrian doors and windows on the north and west elevations with matching brickwork infill; iii) Inclusion of new pedestrian doors on the north and east elevations; iv) Inclusion of a vehicular access roller shutter door on the east elevation; v) Replacement of 15 no. clear cladding panels on the south elevation with clear GRP panels; vi) Replacement of 2 no. existing roof lights with clear GRP panels; vii) Replacement of the existing gutters, RWPs and drip trays with similar new versions; and viii) Erection of lighting and CCTV cameras on the exterior of the warehouse facing into the associated yards. 2. Other works comprising of: i) Provision of 3 no. standalone compactor units; and ii) Inclusion of a perimeter fence and vehicular access gate. 3. All associated site development works and services on a site of c. 0.215 ha.
- Location
- Dublin 7, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- GSDZ4003/20
Numbers and dates
- Project type
- Temporary/event
- Received
- 18 Dec 2020
- Granted
- 19 Feb 2021
- Site start notified
- 20 Sep 2021
- Protected structure
- Yes, RPS 3288
Timeline
- Application received
- Granted
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference GSDZ4003/20.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 20 Sep 2021Notice filed · Material alterations of a warehouse building for the temporary use as an Estates Depot...View the site start
- Completion certificate recordedRecorded in Sep 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.