Large residential · Co. Dublin
Sector 3, Aikens Village, in the Townlands of Woodside and Kilgobbin, Stepaside, Co. Dublin
Granted 12 Dec 2025 (final grant issued 28 Jan 2026)
Key facts
- Planning application LRD25A/0641/WEB at Sector 3, Aikens Village, In The Townlands of Woodside and Kilgobbin, Stepaside, Co. Dublin: Housing development.
- The applicant is Ironborn Real Estate Ltd. The agent is Hughes Planning.
- It was received by Dun Laoghaire Rathdown County Council on 15 Aug 2025.
- Status: Granted 12 Dec 2025 (final grant issued 28 Jan 2026).
- Work was due to start on 7 Oct 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dun Laoghaire Rathdown County Council planning register, checked 3 Nov 2026. Open the council's file
More planning applications in Stepaside · Planning applications in Co. Dublin
What and where
Housing development
Permission (LRD) a) Construction of a large-scale residential development of 209 no. residential units, comprising 18 no. three-bedroom three-storey triplex apartments and 191 no. duplex/own-door apartments (60 no. one-bedroom apartments, 77 no. two-bedroom apartments and 54 no. three-bedroom apartments) across 11 no. blocks ranging in height from three storey to part-three/part-four storey as follows: •Block 1 (4 storeys) comprising 9 no. apartments (3 no. 1 bed units and 6 no. 2 bed units); and a crèche facility at ground floor level of 235.5sq.m with associated outdoor play space of 60sq.m. •Blocks 2 and 3 (part 3/part 4 storeys) comprising 28 no. apartments (2 no. 1 bed units, 9 no. 2 bed units and 17 no. 3 bed units). •Blocks 4 and 5 (3 storeys) comprising 46 no. apartments (22 no. 1 bed units, 20 no. 2 bed units, 4 no. 3 bed units). •Blocks 6 and 7 (3 storeys) comprising 22 no. apartments (2 no. 1 bed units, 8 no. 2 bed units and 12 no. 3 bed units). •Block 8 (3 storeys) comprising 21 units (3 no. 1 bed duplex units and 18 no. 3 bed triplex units). •Blocks 9 and 10 (3 storeys) comprising 30 no. apartments (2 no. 1 bed units, 12 no. 2 bed units and 16 no. 3 bed units). •Block 11 (part 3/part 4 storeys) comprising 53 no. apartments (26 no. 1 bed units, 22 no. 2 bed units and 5 no. 3 bed units) with podium level communal open space, and undercroft providing plant, car parking spaces, motorcycle parking spaces, and bicycle parking spaces. Each apartment will have shared access to adjoining bin stores, car parking bays and bicycle parking bays. Each duplex/own-door apartment will be provided with private amenity space in the form of a balcony or terrace and each triplex apartment will be provided with private amenity space in the form of a ground level terrace and a terrace at second floor level. b) provision of 4,272.7sq.m of landscaped public open space and 3,223.9sq.m of landscaped communal open space on lands under the ownership of the applicants and provision of 5,490.8sq.m of landscaped public open space on lands under the ownership of Dún Laoghaire-Rathdown County Council. c) construction of 2 no. vehicular entrances, with associated internal access road network with pedestrian and cyclist infrastructure, via Thornberry Road and Atkinson Drive, 1 no. vehicular entrance via Atkinson Drive to the undercroft area and 1 no. pedestrian entrance via Village Road. d) Surface level car parking comprises a total of 147 no. car parking spaces, which includes 10 no. accessible spaces, 2 no. set-down spaces along Village Road to serve the creche, and 4 no. motorcycle spaces. Undercroft car park area proposed below Block 11 comprises 58 no. car parking spaces and 6 no. motorcycle spaces. Of the total 205 no. car parking spaces across the scheme 42 no. parking spaces will be provided with EV charging facilities. e) A total of 550 no. bicycle spaces are proposed in the form of 463 no. long-stay bicycle spaces in dedicated bike stores in each block, 82 short- stay visitor spaces at surface level (including 4 no. for the creche) and 5 no. long-stay bicycle spaces to serve the creche in Block 1. f) all ancillary site and infrastructural works, inclusive of removal of existing vehicular entrance via Village Road, provision of pedestrian crossings at Thornberry Road and at the corner of Village Road and Atkinson Drive, general landscaping and planting, boundary treatments, public lighting, plant rooms including 1 no. within undercroft car park for sprinkler system, 2 no. ESB substations at surface level, foul/surface water drainage and attenuation areas, and all associated site works necessary to facilitate the proposed development. All application documentation and information are available for public viewing at the following website set up by the applicant: https://ironbornlrd.com
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Stepaside, Co. Dublin Map
- Planning reference
- LRD25A/0641/WEB
- Application type
- Permission (LRD)
- Applicant
- Ironborn Real Estate Ltd
- Agent
- Hughes Planning
Numbers and dates
- Project type
- Large residential
- Received
- 15 Aug 2025
- Decision to grant
- 12 Dec 2025
- Final grant
- 28 Jan 2026
- Site start notified
- 7 Oct 2026
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Site history
This site's history
-
Application LRD25A/0641/WEB/C4 at the same address: received 6 Nov 2026, no decision recorded yet.
Compliance with Condition No. 17 of Reg Ref No. LRD25A/0641/WEB Same address -
Application LRD25A/0641/WEB/C5 at the same address: received 6 Nov 2026, no decision recorded yet.
Compliance with Condition No. 25 of Reg Ref No. LRD25A/0641/WEB Same address -
Application LRD25A/0641/WEB/C3 at the same address: received 6 Nov 2026, no decision recorded yet.
Compliance with Condition No. 7b of Reg Ref No. LRD25A/0641/WEB Same address -
Application LRD25A/0641/WEB/C1 at the same address: received 21 Oct 2026, no decision recorded yet.
Compliance with Condition No. 12a of Reg Ref No. LRD25A/0641/WEB Same address -
Application LRD25A/0641/WEB/C2 at the same address: received 21 Oct 2026, no decision recorded yet.
Compliance with Condition No. 12e of Reg Ref No. LRD25A/0641/WEB Same address
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file LRD25A/0641/WEB on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Dun Laoghaire Rathdown County Council planning register, checked 3 Nov 2026. We link to the council's own file so you can check the official record before you act.
Site starts
Commencement notices for this permission
- 7 Oct 2026Notice filed · phase 1 · Construction of Block 8 Duplex Units, consisting of 7 no. units, bin and bike stores and...View the site start
- 12 Oct 2026Notice filed · phase 2 · Construction of Block 5, consisting of 25 no. units, bin and bike stores and all...View the site start
- 19 Oct 2026Notice filed · phase 3 · Construction of Block 4, consisting of 21 no. units, bin and bike stores and all...View the site start
- 26 Oct 2026Notice filed · phase 4 · Construction of Block 3, consisting of 13 no. units, bike stores and all ancillary...View the site start
- 3 Nov 2026Notice filed · phase 5 · Construction of Block 10, consisting of 15no. units, bike and bin store and all...View the site start
- 3 Nov 2026Notice filed · phase 6 · Construction of Duplex Block and ground floor creche (Shell and Core only) consisting of...View the site start
- 5 Nov 2026Notice filed · phase 7 · Construction of Block 9 Duplex units, consisting of 15 no. units, bin and bike stores...View the site start
- 11 Nov 2026Notice filed · phase 8 · Construction of Block 7 Duplex units, consisting of 11 no. units, bin and bike stores...View the site start
- 11 Nov 2026Notice filed · phase 9 · Construction of Block 6 Duplex units, consisting of 11 no. units, bin and bike stores...View the site start
- 16 Nov 2026Notice filed · phase 10 · Construction of Block 8 3-Storey houses, consisting of 14 no. units and all ancillary...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area