Infrastructure · Co. Dublin

Red Cow Complex, Naas Road, Dublin 22.

Granted on appeal 2 Sep 2019 (Decision to grant 14 Feb 2019 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 22 by email

Key facts

  • Planning application SD18A/0436 at Red Cow Complex, Naas Road, Dublin 22.: Modify existing permissions Ref. SD17A/0470.
  • It was received by South Dublin County Council on 12 Dec 2018.
  • Status: Granted on appeal 2 Sep 2019 (Decision to grant 14 Feb 2019 by the council).

Source: the South Dublin County Council planning register, as last seen on 2 Jun 2026. Open the council's file

More planning applications in Dublin 22 · Planning applications in Co. Dublin

Council register

The council's register shows: Decision to grant on 14 Feb 2019.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Modify existing permissions Ref. SD17A/0470

Modify existing permissions Ref. SD17A/0470, SD16A/0047, SD15A/0386 and SD15A/0318 to consist of: (a) partial demolition of the existing northeast wing of the original hotel building and the construction of a new hotel wing of a 5 storey over basement with adjoining stairs and lift core of 6 storeys; (b) remodelling of the original main hotel building including removal of mansard roof and the provision of an additional 2 storeys resulting in a 6 storey building; (c) provision of a new glazed atrium (c.490sq.m) with bar at ground floor between the original hotel and recent hotel extension; (d) redesign of the ground floor to provide an enlarged restaurant area to the northeast (by c.242sq.m) and the conversion of 13 ground floor bedrooms into 6 new conference/meeting rooms and event space in the southeast wing of the hotel; (e) provision of a new covered outdoor smoking area of c.31sq.m; (f) demolition of the existing shed and provision of a new ESB substation and switch room (c.54sq.m) in their place; (g) a new service link at first floor level resulting in the removal of one bedroom at first floor level in the newly constructed wing; (h) extension to the café link at ground floor by c.150sq.m.; (i) alterations to stairs, provision of plant and stair/lift cores at roof level; (j) provision of 5 pieces of art signage on the roof, signage over the restaurant and bar at ground floor level on the northwest elevation and signage on the new stair tower at 6th floor level on the northwest and southeast elevations; (k) all associated site development, staff facilities and back of house space, landscaping, open spaces, boundary treatment works, car parking and infrastructural services provision; proposal will result in an additional c.128 new hotel bedrooms (including 12 two room aparthotel/apartment rooms providing a total of c.435 hotel bedrooms. The revisions result in a net increase in gross floor area of hotel accommodation by c.7,106sq.m.

Location
Dublin 22, Co. Dublin Map
Planning reference
SD18A/0436

Numbers and dates

Floor area
7,106 m²
Project type
Infrastructure
Received
12 Dec 2018
Council decision
14 Feb 2019
Appeal lodged
13 Mar 2019
Granted on appeal
2 Sep 2019
Site start notified
13 Mar 2020

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged
  4. Appeal decidedGrant permission with revised conditions
  5. Site start notified

Site history

This site's history

  1. Earlier permission SD17A/0470 for this site: granted 23 Feb 2018, commencement notice filed for a start on 5 Jul 2018.

    Modifications to existing hotel extension previously permitted under Reg. Ref's SD15A/0386 and SD15A/0318 to include the following: (i)… Named in this application's description
  2. Earlier permission SD16A/0047 for this site: granted 8 Apr 2016, commencement notice filed for a start on 27 Sep 2016.

    Modifications to permission, Reg. Ref. SD15A/0138 in addition to concurrent application SD15A/0386, comprising of the following: (1)… Named in this application's description
  3. Earlier permission SD15A/0386 for this site: granted 19 Feb 2016, commencement notice filed for a start on 26 Apr 2016.

    Provision of 2 addtional storeys above the permitted 5 storey extension and containing 52 additional hotel bedrooms; revisions to the… Named in this application's description
  4. Earlier application SD15A/0318 for this site: declared invalid 10 Dec 2015.

    Retention permission for (a) demolition of the existing DMR shed, garage,workshop, storage shed and staff facilities building all comprised… Named in this application's description

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Work packages named so far

  • Services and drainageNamed in the application description
  • Basement parkingNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file SD18A/0436 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
  • AppealGrant permission with revised conditions · 303921 / 2 Sep 2019View the appeal record

How we know this

From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 13 Mar 2020Notice filed · Material Alterations and Extension to the Existing Red Cow Hotel...View the site start
  2. Completion certificate recordedRecorded in Mar 2020 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 22

Get alerts for Dublin 22Free. We email you when new applications appear.

Free email alerts

Get new Dublin 22 projects by email

New applications, decisions and site starts in Dublin 22, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options