Infrastructure · Co. Dublin
Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin
Granted 19 Jan 2022 (final grant issued 24 Mar 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in Lucan by email
Key facts
- Planning application SD21A/0042 at Site Within The Townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin: Two single storey data centres with associated office and service…
- It was received by South Dublin County Council on 14 Dec 2021.
- Status: Granted 19 Jan 2022 (final grant issued 24 Mar 2022).
Source: the South Dublin County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Lucan · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 19 Jan 2022.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Two single storey data centres with associated office and service…
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
- Location
- Lucan, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SD21A/0042
Numbers and dates
- Floor area
- 24,624 m²
- Project type
- Infrastructure
- Received
- 14 Dec 2021
- Decision to grant
- 19 Jan 2022
- Final grant
- 24 Mar 2022
- Site start notified
- 3 Jul 2023
Timeline
- Application received
- Decision to grant
- Appeal lodged
- Appeal decidedAppeal withdrawn S.140(1)(a)
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file SD21A/0042 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
- AppealAppeal withdrawn S.140(1)(a) · 312749 / 8 Mar 2022View the appeal record
How we know this
From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 3 Jul 2023Notice filed · phase 1 · Construction of a new data centre to be known as EDC DUB05 within Grangecastle Business...View the site start
- 17 Jul 2023Notice filed · phase 2 · Construction of a two storey gas powered energy centre on an existing data centre site.View the site start
- Completion certificate recordedRecorded in Jul 2023 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Jul 2023 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.