Infrastructure · Co. Dublin
Site at Kingswood Drive and Kingswood Road within the Citywest Business Campus, Naas Road, Dublin 24
Granted 19 Sep 2022 (final grant issued 3 Nov 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 24 by email
Key facts
- Planning application SD22A/0311 at Site At Kingswood Drive and Kingswood Road Within The Citywest Business Campus, Naas Road, Dublin 24: Amendments to the development permitted under Reg. Ref. SD18A/0301.
- It was received by South Dublin County Council on 26 Jul 2022.
- Status: Granted 19 Sep 2022 (final grant issued 3 Nov 2022).
Source: the South Dublin County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Dublin 24 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 19 Sep 2022.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Amendments to the development permitted under Reg. Ref. SD18A/0301
Amendments to the development permitted under Reg. Ref. SD18A/0301 comprising of alterations to the permitted two storey data centre building including internal reconfiguration, alterations to finished floor levels, alterations to the building footprint to provide for the relocation of an internal staircore to the south of the building, and the replacement of the enclosed first floor level with an open screened roof mounted plant space (resulting in a reduction of 4,091sq.m in the gross floor area (GFA) of the data centre building); Associated alterations to the facade of the data centre building, including alterations to fenestration, cladding, step-out in the southern facade to accommodate a staircore, and a reduction in the eastern building parapet height of c. 2 metres; Provision of a canopy over the loading docks on the east facade; Alterations to the permitted generator compound, generators, and flues, including a reduction in the number of generators (5 now proposed), and provision of MV rooms within the generator compound; Provision of an ESB substation compound in the north-eastern portion of the site, comprising a single storey substation building (with a GFA of c. 125sq.m), within a 2.6 metre high security fence, 2 transformers, client control building (with a GFA of c. 47sq.m), and associated access arrangements; The ESB substation compound will be accessed from Kingswood Drive; Omission of the permitted sprinkler tank, pump room and 10kV Substation, reconfiguration of the permitted car parking, and revisions to permitted boundary treatments; Associated alterations to landscaping, access and internal road arrangements, services, lighting, and layout, and all associated and ancillary works.
- Location
- Dublin 24, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SD22A/0311
Numbers and dates
- Floor area
- 7,582 m²
- Project type
- Infrastructure
- Received
- 26 Jul 2022
- Decision to grant
- 19 Sep 2022
- Final grant
- 3 Nov 2022
- Site start notified
- 18 Apr 2023
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Site history
This site's history
-
Earlier permission SD18A/0301 for this site: granted 18 Dec 2018.
Construction of a 2 storey data centre (including associated office space) of 10,622sq.m, associated generators, sprinkler tank and… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file SD22A/0311 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 18 Apr 2023Notice filed · phase 1 · Construction of containerised Substation with half basement, transformer bunds and...View the site start
- 21 Aug 2023Notice filed · phase 2 · Construction of a single-storey blockwork electricity substation buildingView the site start
- Completion certificate recordedRecorded in Apr 2023 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Aug 2023 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.