Site start · Co. Dublin
Clondalkin, Dublin 22, Dublin
Granted 14 Jun 2023 (final grant issued 25 Jul 2023)
Key facts
- Site start record SD23A/0079 at Clondalkin, Dublin 22, Dublin: Alterations to a previously approved development.
- The planning authority is South Dublin County Council.
- Status: Granted 14 Jun 2023 (final grant issued 25 Jul 2023).
Source: the South Dublin County Council planning register, as last seen on 12 Jul 2026. Open the council's file
More planning applications in Dublin 22 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 14 Jun 2023.
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Alterations to a previously approved development
Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
- Location
- Dublin 22, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SD23A/0079
- Application type
- Commencement Notice
- Owner named on the notice
- Grange Backup Power Ltd
- Agent named on the notice
- Collen Construction Ltd
Numbers and dates
- Floor area
- 3,859 m²
- Project type
- Infrastructure
- Received
- 20 Apr 2023
- Decision to grant
- 14 Jun 2023
- Final grant
- 25 Jul 2023
- Site start notified
- 27 Nov 2023
Site history
This site's history
-
Earlier permission SD15A/0061 for this site: granted 15 May 2015.
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and… Named in this application's description -
Earlier permission SD16A/0398 for this site: granted 19 Jan 2017, commencement notice filed for a start on 17 Oct 2022.
Amendments to previously granted planning permission, Reg. Ref. SD15A/0061, consisting of the following: reduction of capacity of the plant… Named in this application's description -
Site start under planning reference SD23A/0079 SD15A/0061 SD16A/0398 at the same map point: commencement notice filed for a start on 4 Dec 2024.
Ancillary containerised plant building on the Grange Castle Powerplant site. The building will house the Continuous Emissions Monitoring… Same map point
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Documents and evidence
Check the record
- Council planning fileThe application file SD23A/0079 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 27 Nov 2023Notice filed · It is proposed to construct a new ancillary building on the Grangecastle Powerplant...View the site start
- Completion certificate recordedRecorded in Nov 2023 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.