Site start · Co. Dublin
Dublin, Dublin
Site start 30 Jul 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
What and where
Extension
Extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22 as follows: 1. The existing warehousing Unit 1 (existing total area 11,725 m², comprised of 8,526 m² warehouse area and 3,199 m² of two storey ancillary offices) is proposed to be subdivided into two units as follows: A. Unit 1A, 2,582 m² in total including redesigned ancillary offices on 2 floors with an overall area of 522 m² (note: existing two storey office will be reduced by the demolition of 259 m² first floor offices and change of use of part of ground floor office, 281 m², to warehousing space), with a resulting warehouse area of 2,060 m². B. Unit 1B, 8,116 m² in total including redesigned ancillary offices on 2 floors with an overall area of 568 m² (note: existing two storey office will be reduced by demolition of 768 m² first floor offices and change of use of part of ground floor office, 801 m², to warehousing space) with a resulting warehouse area of 7,548 m². Both of the above units to receive front/southern elevation upgrades and access improvements of HGV's entering the site through two improved existing entrance/exit locations, addition of 1 no. goods door to Unit 1A, addition of 4 no. dock leveller doors & 1 no. goods door to Unit 1B, removal of a disused sprinkler pumphouse/plant room & (167 m²) and sprinkler tank (24 m², 7m high) to the rear of Unit 1B, associated elevational changes, drainage works including surface water swales, landscaping, rearranged car parking, provision of cycle parking and associated site development works. 2. Existing Unit 2 building area remains unaltered. 3. Existing Unit 3 with a total area of 4,995 m², proposed alterations will include existing warehouse office area (90 m² total over 3 locations) to be reduced to 42 m² by the demolition of 24 m² of first floor office and the change of use of 24 m² of part of ground floor office area to the warehousing area, and separately demolition of 147 m² of adjoined warehouse corridor resulting in 4,782 m² of warehouse area with the addition of a proposed new two storey adjoined ancillary office area extension of 358 m², with associated elevation works, ancillary cycle parking and adjusted car parking, addition of 2no. dock leveller doors & 1 no. goods door to the side/eastern elevation plus associated drainage works including surface water swales, landscaping and associated site development works.
- Location
- Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SD24A/0015
- Applicant
- Maples Group
- Agent
- Dowds Group
- Builder
- Dowds Group
Key facts
- Homes
- ~1estimated from the application
- Floor area
- 358 m²
- Indicative value
- €250k–500kPlanningBrief estimate
- Project type
- Commercial fit-out
- Site start
- 30 Jul 2024
Documents and evidence
Check the record
- Council planning fileThe application file SD24A/0015 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 30 Jul 2024Work started · The proposed works comprises of a new extension to an already existing storage unit. The...
- Completion certificate recordedRecorded in Jul 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Sep 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.