Planning record · Co. Dublin

The Speaker Connolly Tavern, Firhouse Road, Dublin 24, D24E400.

Granted on appeal 11 Aug 2025 (Decision to grant 10 Mar 2025 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 24 by email

Key facts

  • Planning application SD24A/0228W at The Speaker Connolly Tavern, Firhouse Road, Dublin 24, D24E400.: Seabren Developments Limited intend to apply to South Dublin County…
  • It was received by South Dublin County Council on 16 Oct 2024.
  • Status: Granted on appeal 11 Aug 2025 (Decision to grant 10 Mar 2025 by the council).
  • A commencement notice says work is due to start on 23 Nov 2026. It does not say which contractors or suppliers are appointed.

Source: the South Dublin County Council planning register, as last seen on 2 Jun 2026. Open the council's file

More planning applications in Dublin 24 · Planning applications in Co. Dublin

Council register

The council's register shows: Decision to grant on 10 Mar 2025.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Seabren Developments Limited intend to apply to South Dublin County…

Seabren Developments Limited intend to apply to South Dublin County Council for planning permission at the Speaker Connolly Tavern. The site is bounded by Firhouse Road to the northwest, Ballycullen Avenue to the northeast, Firhouse Shopping Centre and car park to the south and neighbourhood shops to the east of the site. Vehicular access to the site will be from the existing vehicular access on Ballycullen Avenue with the existing right of way to and from the Supervalu Shopping Centre maintained. The proposed development will consist of the demolition of the Speaker Connolly public house including the part single part two storey public house, and ancillary stores and structures (c.411 m²), on a development site of 0.323 Hectares (overall site area 0.332 Ha), and the development of 55 residential units together with commercial uses (gross floor area 7351.4 sq.m.) all in one building ranging in height from 4 to 6 storeys and part basement, comprising: • 17 One Bed Apartments • 38 Two Bed Apartments • 1 no. Public House and Restaurant (c.457.9 sq.m), 1 no. Cafe (c. 72 sq.m) and 1 no. Beauty Salon 27sq.m at ground floor level • 1 no. Medical Centre 144Sq.m and 1 no. Gym 114.8 sq.m at first floor level • Existing basement will be used as a plant room (c.127.6 sq.m). The works include removal of the boundary wall along Ballycullen Avenue, reconfiguration of the existing entrance, access road and public footpath and use of the existing internal access road including the vehicular link between Ballycullen Avenue and the Firhouse Shopping Centre. The development will also consist of the provision of enhanced pedestrian infrastructure, provision of communal open space (c.297 sq.m) at podium level and related play areas, public open space (c.390)including hard and soft landscaping, boundary treatment, street furniture, car parking along the internal access road (2 visitor spaces), below podium car parking (25 no. spaces, including 2 accessible spaces and 2 car share spaces), electric vehicle charging points (4. no. of spaces), bicycle parking (104 long stay, 48 short stay spaces and 4 cargo bike spaces), ESB substation and electrical services area, piped infrastructural services and connections to existing public services, ducting; plant, waste management provision, SuDS measures including Green/Blue roofs, stormwater management, signage; public lighting, solar panels as well as telecommunications infrastructure including 18 No. antennas enclosed in 9 No. shrouds and 6 No. transmission dishes, together with all associated equipment and all ancillary site development and excavation works above and below ground. An Coimisiún Pleanála-322215-25 Condition 10:

Location
Dublin 24, Co. Dublin Map
Planning reference
SD24A/0228W

Numbers and dates

Project type
Planning record
Received
16 Oct 2024
Council decision
10 Mar 2025
Appeal lodged
7 Apr 2025
Granted on appeal
11 Aug 2025
Planned start
23 Nov 2026

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodgedCase 322187
  4. Appeal decidedInvalid- fee S.127(1)(f) · Case 322187
  5. Appeal lodgedCase 322215
  6. Appeal decidedGrant permission with revised conditions · Case 322215
  7. Planned start

Outlook

What happens next

A commencement notice says work is due to start on 23 Nov 2026. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • Basement parkingNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 23 Nov 2026Planned start · Phased completion of Proposed Mixed development consisting of apartments & commercial...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 24

Get alerts for Dublin 24Free. We email you when new applications appear.

Free email alerts

Get new Dublin 24 projects by email

New applications, decisions and site starts in Dublin 24, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.