Commercial fit-out · Co. Dublin

The Former Meridian Building, Whitestown Drive, Tallaght Business Park, Dublin 24, D24 HH50

Granted 29 Jan 2026 (final grant issued 10 Mar 2026)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application SD25A/0143W at The Former Meridian Building, Whitestown Drive, Tallaght Business Park, Dublin 24, D24 HH50: Part change of use.
  • It was received by South Dublin County Council on 22 Dec 2025.
  • Status: Granted 29 Jan 2026 (final grant issued 10 Mar 2026).
  • Work was due to start on 3 Nov 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the South Dublin County Council planning register, checked 2 Jun 2026. Open the council's file

More planning applications in Dublin 24 · Planning applications in Co. Dublin

What and where

Part change of use

• Part change of use at ground floor level from office use to warehouse / logistics use (with a Gross Floor Area (GFA) of 944 sq.m) and light industry- manufacturing / food processing use (GFA of 1,860 sq.m), including ancillary staff welfare facilities, with the remainder of the existing floorspace (GFA of 712 sq.m) unchanged from the existing office use; • Proposed extension to the rear / south elevation of the existing building (with a GFA of 861 sq.m), comprising one level with a height of 7.47m, to provide an additional ancillary store to the proposed light industry- manufacturing / food processing use; • Proposed two storey extension (GFA of 13 sq.m) to the north elevation to provide an additional lift shaft and proposed extensions to the northern and west elevations to provide additional lobby / entrance areas (12 sq.m); • Provision of additional floorspace at first floor level (within the existing building envelope) to provide an additional 1,040 sq.m (GFA) of office floor space, ancillary staff welfare facilities, ancillary innovation and testing rooms, storage and plant rooms, and an additional 163 sq.m (GFA) of a mezzanine storage area; • Associated internal reconfigurations and installation of new internal partition walls, and associated alterations to the elevations including materials and fenestration arrangement, additional loading bays and roller shutter doors; • Provision of associated signage including an internally illuminated sign adjacent to the security entrance gate, a directional sign, internally illuminated signage over the entrance doors to the unit and 2 no. signs over entrance canopies; • Reconfigured car parking to provide 72 no. car parking spaces (a reduction from 134), widening of the internal service road, provision of new pedestrian footpaths from the estate road, internal segregated pedestrian footpaths and crossing, and the provision of a security fence and gate; • The proposal includes dock leveller, landscaping, bicycle store, external store with WC/garden store/bin store, plant compound, PV panels to new rear extension roof and bicycle store roof, surface water drainage, including detention pond and swale, and all associated works. The proposed development results in an overall increase of 2,089 sq.m in the total GFA of the unit from 3,516 sq.m to 5,605 sq.m, comprising office, warehouse / logistics, light industry manufacturing / food processing uses, and ancillary staff welfare facilities, innovation and testing rooms, storage and plant rooms.

Location
Dublin 24, Co. Dublin Map
Planning reference
SD25A/0143W

Numbers and dates

Floor area
4,893 m²
Estimated construction value
€16m to €23mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Commercial fit-out
Received
22 Dec 2025
Decision to grant
29 Jan 2026
Final grant
10 Mar 2026
Site start notified
3 Nov 2026

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work was due to start on 3 Nov 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file SD25A/0143W on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the South Dublin County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Site starts

Commencement notices for this permission

  1. 3 Nov 2026Notice filed · First Phase of development to include Part change of use of existing building at ground...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 24

Get alerts for Dublin 24Free. We email you when new applications appear.

Free email alerts

Get new Dublin 24 projects by email

New applications, decisions and site starts in Dublin 24, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options