Infrastructure · Co. Dublin
Grange Castle Business Park, New Nangor Road, Clondalkin, Dublin 22
Granted 14 Aug 2025 (final grant issued 23 Sep 2025)
Key facts
- Planning application SD25A/0149W at Grange Castle Business Park, New Nangor Road, Clondalkin, Dublin 22: Additions.
- It was received by South Dublin County Council on 20 Jun 2025.
- Status: Granted 14 Aug 2025 (final grant issued 23 Sep 2025).
- Work started on site on 27 Oct 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the South Dublin County Council planning register, checked 2 Jun 2026. Open the council's file
More planning applications in Dublin 22 · Planning applications in Co. Dublin
Since you last looked
Worked out in this browser from the record's own dates.
What and where
Additions
The development consists of additions, alterations and modifications to the existing and permitted industrial facilities (permitted under Reg. Ref. SD23A/0123) at the Pfizer site in Grange Castle. They include; (a) The relocation of and modifications to the previously permitted photovoltaic solar panel substation, adjacent to the car park at the centre of the site and to the south-east of the DS2 building permitted under Reg. Ref. SD23A/0123. The proposed building is now approximately 41 square metres and approximately 6.3 metres high. (b) The construction of a waste compound office, within the waste compound to the south of the DS2 building, both previously permitted under Reg. Ref. SD23A/0123. The proposed building is approximately 14.4 square metres and approximately 2.85 metres high. (c) Modifications and alterations to the existing access and egress (Pfizer Gate No. 3) from the public road within the Grange Castle Business Park, including installation of new vehicular gate and associated fencing including associated minor alterations to existing adjacent berms and modifications and alterations to the existing public pathway and public cycle lane adjacent to the existing entrance (Pfizer Gate No. 3). (d) The works also include modifications to previously permitted underground utilities, site lighting, internal roads and footpaths and all associated siteworks.
- Location
- Dublin 22, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SD25A/0149W
Numbers and dates
- Floor area
- 56 m²
- Project type
- Infrastructure
- Received
- 20 Jun 2025
- Decision to grant
- 14 Aug 2025
- Final grant
- 23 Sep 2025
- Site start
- 27 Oct 2025
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start
Site history
This site's history
-
Earlier permission SD23A/0123 for this site: granted 17 Jul 2023.
Permission for development consisting of the completion of the development granted permission under Planning Application Reg. Ref… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file SD25A/0149W on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Site starts
Commencement notices for this permission
- 27 Oct 2025Work started · Pfizer DS2 - EV PV - Photovoltaic Solar Panel Substation [2025]
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.