  • Planning application SD25A/0191W at Cloverhill Industrial Estate, Clondalkin, Dublin 22: Retention of several items further to the construction…
  • It was received by South Dublin County Council on 18 Aug 2025.
  • Status: Granted 9 Oct 2025 (final grant issued 19 Nov 2025).
  • Permission was granted on 9 Oct 2025 and the final grant issued on 19 Nov 2025. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the South Dublin County Council planning register, checked 2 Jun 2026. Open the council's file

More planning applications in Dublin 22 · Planning applications in Co. Dublin

What and where

Retention of several items further to the construction…

Retention Permission for several items further to the construction of the development as granted planning under South Dublin County Council Reg. Ref. SD24A/0015 for an extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22. The items for which Retention Permission is sought are as follows: 1.Alterations at Unit 1, resulting in a total area of 10,153 m² (10,120 m² of warehouse area, and 33 m² of Staff Facilities Area) as follows: A.Omission of previously proposed subdivision of Unit 1 in two units (Unit 1A and Unit 1B), with no area change. B.Change of use of 276 m² of Ancillary Office Area and 236 m² of Staff Facilities Area to Warehouse Area (at Ground Floor) and removal of 545 m² of Ancillary Office and Staff Facilities Area (at First Floor) due to the omission of previously proposed 2 storey Ancillary Office for Unit 1A and Unit 1B and redesign of existing Plant Room area at North-western corner of Unit 1 to accommodate warehouse toilet block and IT room. 2.Alterations at Unit 3: change of use of 3 m² of Staff Facilities Area to Ancillary Office Area and 39 m² of Ancillary Office Area to Warehouse Area (at Ground Floor) and 3 m² of Ancillary Office Area to Staff Facilities Area (at First Floor), resulting in 5,182 m² (4,824 m² of warehouse area, 221 m² of Ancillary Office Area and 137 m² of Staff Facilities Area) due to the structural design arrangements at the Ancillary Office and demolition of 2No. existing warehouse offices. 3.Previously proposed existing internal roller door to be built up, now retained to provide a connection between Unit 1 and Unit 3. 4. Elevational changes, with no floor area changes, due to the above mentioned modifications, including: A.Addition of 3No. fire escape concrete steps and refugee area at Unit 1. B.Omission of 2No. personal doors at Unit 1. C.Relocation of 1No. level entry door at Unit 1 and, D.Omission of 1 dock leveller door due to the retention of existing level door and personnel door at Unit 3. 5.Associated site works including: A.Existing ancillary area at front elevation of Unit 1 is retained unaltered. B.Previously proposed HGV access at front elevation of Unit 1 now omitted due to the omission of the subdivision on Unit 1, HGV access is now at South-eastern corner of the site. C.Addition of fence and swinging gate for fire escape circulation at South-western corner of Unit 1 and omission of fire tender swinging gate at the rear of the site, between Unit 1 and Unit 3. D.Site works adjustments due to elevational changes. All other elements remain as per granted planning application Reg. Ref. SD24A/0015.

Location
Dublin 22, Co. Dublin Map
Planning reference
SD25A/0191W
Application type
Retention permission

Numbers and dates

Project type
Mixed use
Received
18 Aug 2025
Decision to grant
9 Oct 2025
Final grant
19 Nov 2025

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued

Site history

This site's history

  1. Earlier permission SD24A/0015 for this site: granted 13 Mar 2024, commencement notice filed for a start on 25 Jul 2024.

    Extension, refurbishment, and alterations to adjoined warehousing Units 1, 2 & 3 Cloverhill Industrial Estate, Clondalkin, Dublin 22 as… Named in this application's description

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Permission was granted on 9 Oct 2025 and the final grant issued on 19 Nov 2025. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file SD25A/0191W on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the South Dublin County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Dublin 22

Get alerts for Dublin 22Free. We email you when new applications appear.

Free email alerts

Get new Dublin 22 projects by email

New applications, decisions and site starts in Dublin 22, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options