Back to leads
Granted

~86 dwellings, Cookstown House, Cookstown Way, Tallaght, Dublin 24. - Planning Application SD25A/0207W

Dublin / Dublin 24 / Cookstown House, Cookstown Way, Tallaght, Dublin 24.

Est. value Not listed
Units 86
Floor area 382 m²
Decision 23 Oct 2025

Source-linked planning record

~86 dwellings, Cookstown House, Cookstown Way, Tallaght, Dublin 24. - Planning Application SD25A/0207W

Dublin / Dublin 24 / Cookstown House, Cookstown Way, Tallaght, Dublin 24.
PB ref
PB-10000400385
Plan ref
SD25A/0207W
Authority
South Dublin County Council
Stage / date
Granted / 23 Oct 2025
Est. value band
Value not disclosed
Units / floor
86 / 382 m²
Project class
Mixed use
Promoter
not included in reference feed
Architect / agent
not included in reference feed

Source: https://planning.agileapplications.ie/southdublin/application-details/68848

Key facts

Lead summary

Source
South Dublin County Council public planning register
Planning authority
South Dublin County Council
Application reference
SD25A/0207W
Applicant
not included in reference feed
Agent
not included in reference feed
Decision stage
Granted
Decision
23 Oct 2025
Units
86
Floor area
382 m²

Official description

Verbatim source text

We, KAVCO C TOWN PROJECT LIMITED, intend to apply for planning permission for the proposed development at the site, Cookstown House, Cookstown Way, Tallaght, Dublin 24. The proposed development consists of the following: modifications of the previously approved application SDCC Reg. Ref. SD23A/0237. The proposed modifications include a revised Ground-floor layout to convert the previous commercial unit, the adjacent refuse store and part of the previous communal amenity space into an additional 6 no. residential units as follows; 1 no. studio unit, 3 no. one-bedroom units and 2 no. two-bedroom units. The proposed changes will increase the total number of apartments from 80 no. units to 86 no. units. A recessed balcony has been provided to each of the proposed apartments. Minor modifications are to be made to the elevations at ground floor level only. There are no changes proposed to the height of the building. All with associated site works, bin and bicycle storage.

Verify against official source

Project team

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed

Lifecycle timeline

Application to site progress

  1. Applied

    29 Aug 2025 SD25A/0207W
  2. Decision

    Grant Permission 23 Oct 2025
  3. Commenced

    18 Dec 2025 SN0013502SD
  4. Completed

    Completion not recorded Smaller works often do not require a completion certificate.

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceElectricalFire SafetyFit-outHealth & SafetyMain contractorMechanicalPlumbingSecuritySignageWindows/Doors
Board this lead Create alert