Development Description
The development will consist of the replacement of an existing grass training pitch with a synthetic grass 3G all-weather pitch (maximum size 74m x 34.5m), Installation of perimeter weld-mesh fencing of varying heights (1.2m to 3.0m), installation of ball-stop netting and posts behind goals, flood lighting columns and all associated hard and soft landscaping and ancillary works, including new steps and a pedestrian entrance to St. Mary's National School.