GrantedDecision recorded

Commercial fit-out, 3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin...

Dublin 22, Dublin · South Dublin County Council · Plan SD25A/0301W · PB ref PB-10000400244

The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the...

Indicative value €<250k PB indicative band
Units applied for Not listed public application record
Floor area 149 m² published reliable figure
Decision 8 Apr 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 8 Apr 2026. / Confidence: Low
Decision GRANT PERMISSION FOR RETENTION

Decision date 8 Apr 2026.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord...

Ref SD25A/0301W Source-linked Official application description for exact planning reference SD25A/0301W
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
South Dublin County Council
Exact reference
SD25A/0301W
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Commercial fit-out

Commercial fit-out

The public application record identifies commercial fit-out in the submitted planning scope.

SD25A/0301WExplicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale SD25A/0301W

The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.

AuthoritySouth Dublin County Council
ReferenceSD25A/0301W
StatusChecked 2 Jun 2026
Open official record