Commercial fit-out · Co. Dublin

160, Holly Road, Western Industrial Estate, Dublin 12, D12R861

Further information requested 14 Jul 2026

Get updates on this application

We'll email you when the council decides, if the decision is appealed, and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application SD26A/0117W at 160, Holly Road, Western Industrial Estate, Dublin 12, D12R861: Two storey extension.
  • It was received by South Dublin County Council on 20 May 2026.
  • Status: Further information requested 14 Jul 2026.
  • The council asked for further information on 14 Jul 2026. It decides after the applicant replies.

Source: the South Dublin County Council planning register, checked 6 Aug 2026. Open the council's file

More planning applications in Dublin 12 · Planning applications in Co. Dublin

What and where

Two storey extension

The construction of a two storey extension (c. 6.5m high with a proposed total floor area c. 261 m sq.) to north and east side of existing two storey light industrial building to provide a showroom (window & door display and sales area), loading bays, office & ancillary areas & all associated site works including demarcation of carparking and bicycle spaces and retention permission to retain c. 155 linear meters of existing c.2.5m high boundary comprising dwarf wall & railing and the two no. vehicular entrance gates all on site (0.31 Ha.).

Location
Dublin 12, Co. Dublin Map
Planning reference
SD26A/0117W

Numbers and dates

Floor area
261 m²
Estimated construction value
€860k to €1.3mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Commercial fit-out
Received
20 May 2026

Timeline

  1. Application received
  2. Further information requested

Outlook

What happens next

The council asked for further information on 14 Jul 2026. It decides after the applicant replies.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file SD26A/0117W on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

Reviewed build intelligence

What the documents establish

Government document review

The signed 14 July further-information request leaves access, parking and water design unresolved for a 261 m² extension. Existing building areas and retained boundary works are distinct; the May drawings are planning submissions, not a grant or construction issue.

5 official documents inspected · Checked 2026-09-07 · Official file index

The 261 m² addition is separate from existing and retained work

May proposed extension and separate retention scope; July further information remains outstanding

What the evidence says
The ground and first-floor schedules distinguish 1,285 m² existing building from 261 m² proposed addition, giving 1,546 m² combined. Yellow outlines identify new showroom, van-loading, office and display-walkway areas. The application separately seeks retention of about 155 linear metres of existing boundary and two gates. Its description says approximately 6.5 m high; the elevation dimension is 6.13 m, so final height should be checked against the eventual approved drawing.

Why it may matter — interpretation
Commercial fit-out and building teams can distinguish the addition from the existing warehouse and retained boundary instead of pricing the combined total as new build.

What is not established
A final permission, reconciled approved height, structural design and installed facade products are not established.

Inspect the evidence

Signed request for further information · p.1
Development: 261 ... 6.5m ... retention ... 155 linear meters · Issued 2026-07-14 · Decision Order 0789; signed 14 July 2026; additional information required · Checked 2026-09-07

Development: 261 ... 6.5m ... retention ... 155 linear meters

Proposed ground floor and area schedule · p.1
EXISTING 1285; NEW PROPOSED 261; TOTAL 1546; yellow outline · Issued 2026-05-14 · D1297-3-13; issue date 14 May; revision blank; received 20 May; planning purposes only · Checked 2026-09-07

EXISTING 1285; NEW PROPOSED 261; TOTAL 1546; yellow outline

Proposed first floor and display walkway · p.1
VOID; DISPLAY WALKWAY; proposed yellow outline · Issued 2026-05-14 · D1297-3-14; issue date 14 May; revision blank; received 20 May; planning purposes only · Checked 2026-09-07

VOID; DISPLAY WALKWAY; proposed yellow outline

Proposed elevations and sections · p.1
PROPOSED; EXISTING; 6130 elevation dimension · Issued 2026-05-14 · D1297-3-15; issue date 14 May; revision blank; received 20 May; planning purposes only · Checked 2026-09-07

PROPOSED; EXISTING; 6130 elevation dimension

Parking and large-vehicle movements need revised drawings

Roads information requested on 14 July

What the evidence says
FI item 1 requires parking and bicycle layouts at not less than 1:200, with calculations covering all proposed uses and floorspace, including warehouse and office. It also requires swept paths demonstrating access and exit for fire tenders and large refuse vehicles. The May 1:500 site plan shows parking and existing entrances but does not close that later request.

Why it may matter — interpretation
Transport and civil designers need an integrated service-vehicle and parking layout before treating the site arrangement as settled.

What is not established
A revised submission, council acceptance and agreed parking or bicycle counts were not found in the reviewed catalogue.

Inspect the evidence

Signed request for further information · p.1
1. Access and Parking (a)-(b) · Issued 2026-07-14 · Decision Order 0789; signed 14 July 2026; additional information required · Checked 2026-09-07

1. Access and Parking (a)-(b)

Signed request for further information · p.2
(c) swept path analysis; all proposed uses/floor space · Issued 2026-07-14 · Decision Order 0789; signed 14 July 2026; additional information required · Checked 2026-09-07

(c) swept path analysis; all proposed uses/floor space

Proposed site layout and existing entrances · p.1
SITE LAYOUT 1:500; EXISTING SITE ACCESS · Issued 2026-05-14 · D1297-3-03; issue date 14 May; revision blank; received 20 May; planning purposes only · Checked 2026-09-07

SITE LAYOUT 1:500; EXISTING SITE ACCESS

Surface-water calculations and a SuDS design remain required

Unresolved drainage and attenuation request dated 14 July

What the evidence says
FI item 2 requests drainage plans and sections through the public sewer connection, maximum discharge in litres per second, and attenuation volumes based on surface areas and runoff coefficients. It requires SuDS and expressly says underground attenuation tanks are not permitted. The listed green roofs, swales and other measures are examples, not selected installed systems.

Why it may matter — interpretation
Drainage designers need the runoff model, discharge constraint and accepted above-ground or source-control arrangement before selecting products.

What is not established
Accepted discharge rate, storage volume, chosen SuDS components and completed drainage are not established.

Inspect the evidence

Signed request for further information · p.2
2. Water Services (a)-(c); Underground attenuation tanks are not permitted · Issued 2026-07-14 · Decision Order 0789; signed 14 July 2026; additional information required · Checked 2026-09-07

2. Water Services (a)-(c); Underground attenuation tanks are not permitted

The extension must be coordinated with a 150 mm watermain

Existing utility constraint identified in the information request

What the evidence says
The July water-services note identifies an existing 150 mm watermain to the north, east and south of the site and asks the applicant to consult Uisce Eireann about the building setback. The proposed extension is on the north and east of the existing building.

Why it may matter — interpretation
Utility and structural teams should resolve the main alignment and setback before fixing foundations and external works.

What is not established
A surveyed main route, agreed setback, diversion requirement or Uisce Eireann acceptance was not reviewed.

Inspect the evidence

Signed request for further information · p.2
existing 150mm diameter watermain ... North, East and South ... setback · Issued 2026-07-14 · Decision Order 0789; signed 14 July 2026; additional information required · Checked 2026-09-07

existing 150mm diameter watermain ... North, East and South ... setback

Proposed ground floor and area schedule · p.1
PROPOSED STRUCTURES OUTLINED IN YELLOW · Issued 2026-05-14 · D1297-3-13; issue date 14 May; revision blank; received 20 May; planning purposes only · Checked 2026-09-07

PROPOSED STRUCTURES OUTLINED IN YELLOW
Remaining document questions
  • Has a coordinated response resolved parking, large-vehicle movements, SuDS and the watermain setback?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

How we know this

From the South Dublin County Council planning register, checked 6 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Dublin 12

Get alerts for Dublin 12Free. We email you when new applications appear.

Free email alerts

Get new Dublin 12 projects by email

New applications, decisions and site starts in Dublin 12, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options