Save this project to account
Granted · decision due 14 Sep 2026Decision recorded

Residential development, 21, Pairc Mhuire, Saggart, Co Dublin, D24 A297

Saggart, Dublin · South Dublin County Council · Plan SD26A/0176W · PB ref PB-3280209945

Permission for link corridor between original dwelling and dwelling including open porch in rear garden and Retention permission for dwelling in rear garden to be incorporated as extension to dwelling.

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 14 Sep 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 14 Sep 2026. / Confidence: Low
Decision Grant Permission & Grant Retention

Decision date 14 Sep 2026.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

Permission for link corridor between original dwelling and dwelling including open porch in rear garden and Retention permission for dwelling in rear garden to be incorporated as extension to dwelling.

Ref SD26A/0176W Source-linked Official application description for exact planning reference SD26A/0176W
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
South Dublin County Council
Exact reference
SD26A/0176W
Evidence reviewed
25 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Small residential

Small residential

The public application record identifies small residential in the submitted planning scope.

SD26A/0176WExplicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Patrick Carney
Planning agent
Bill Doran

Reviewed build intelligence

What the documents establish

Government document review

Decision recorded; appeal window open and no exact commencement link. Scale reflects the permitted decision record.

3 official documents inspected · Checked 2026-09-19 · Official file index

Service access

Application record · South Dublin County Council SD26A/0176W official inventory date date not stated: application scheme as submitted or assessed at that date, evidenced by Acknowledgement / Validation Letter, Chief Executives Order, Notification of Decision; any later dated revision is a separate state.

What the evidence says
vehicular access

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Chief Executives Order · p.1
Page 1 · Issued Not stated · South Dublin County Council SD26A/0176W - Chief Executives Order (decision); date not stated in the official inventory; retained revision sha256:8e84a87bf7b4 · Checked 2026-09-19

vehicular access

Photovoltaic panels

Application record · South Dublin County Council SD26A/0176W official inventory date date not stated: application scheme as submitted or assessed at that date, evidenced by Acknowledgement / Validation Letter, Chief Executives Order, Notification of Decision; any later dated revision is a separate state.

What the evidence says
solar panels 3m x 2m

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Chief Executives Order · p.3
Page 3 · Issued Not stated · South Dublin County Council SD26A/0176W - Chief Executives Order (decision); date not stated in the official inventory; retained revision sha256:8e84a87bf7b4 · Checked 2026-09-19

solar panels 3m x 2m

Bedrooms

Application record · South Dublin County Council SD26A/0176W official inventory date date not stated: application scheme as submitted or assessed at that date, evidenced by Acknowledgement / Validation Letter, Chief Executives Order, Notification of Decision; any later dated revision is a separate state.

What the evidence says
2 bedrooms

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Chief Executives Order · p.3
Page 3 · Issued Not stated · South Dublin County Council SD26A/0176W - Chief Executives Order (decision); date not stated in the official inventory; retained revision sha256:8e84a87bf7b4 · Checked 2026-09-19

2 -bedroom

Gross floor area

Application record · South Dublin County Council SD26A/0176W official inventory date date not stated: application scheme as submitted or assessed at that date, evidenced by Acknowledgement / Validation Letter, Chief Executives Order, Notification of Decision; any later dated revision is a separate state.

What the evidence says
76 m²

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Chief Executives Order · p.3
Page 3 · Issued Not stated · South Dublin County Council SD26A/0176W - Chief Executives Order (decision); date not stated in the official inventory; retained revision sha256:8e84a87bf7b4 · Checked 2026-09-19

76sqm
Remaining document questions
  • Inspect any later revision the authority replaces at the same URL.
  • Link the commencement and completion events when they arrive.

3 retained official PDF revision(s) from the exact South Dublin County Council SD26A/0176W file list. Machine extraction reads bounded passages; drawings are not interpreted.

Official description

Application text

Permission for link corridor between original dwelling and dwelling including open porch in rear garden and Retention permission for dwelling in rear garden to be incorporated as extension to dwelling.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale SD26A/0176W

Permission for link corridor between original dwelling and dwelling including open porch in rear garden and Retention permission for dwelling in rear garden to be incorporated as extension to dwelling.

AuthoritySouth Dublin County Council
ReferenceSD26A/0176W
StatusChecked 25 Sep 2026
Open official record