Large residential · Co. Dublin
Tobermaclugg Development Area, within Adamstown SDZ, Lucan, Co. Dublin.
Granted 15 Mar 2018
We no longer update this application, so we can't email you about it. Get new planning applications in Lucan by email
Key facts
- Planning application SDZ18A/0002 at Tobermaclugg Development Area, Within Adamstown SDZ, Lucan, Co. Dublin.: Housing development.
- It was received by South Dublin County Council on 19 Jan 2018.
- Status: Granted 15 Mar 2018.
Source: the South Dublin County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Lucan · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 15 Mar 2018.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Housing development
Permission for development of 268 dwellings comprising of the following: 184 two and three storey houses consisting of 102 three-bedroom houses (ranging from 111sq.m to 157sq.m), 67 four-bedroom houses (ranging from 135sq.m to 154sq.m) and 15 five bedroom houses (ranging from 169sq.m to 176sq.m) with associated private gardens, car parking and bin storage areas, in a mix of detached, semi-detached and terraced units; Block 1 (931sq.m gross floor area): four storey L-shaped terraced block consisting of 8 duplex units comprising 4 two bedroom duplex units (ranging from 93sq.m to 100sq.m) and 4 three bedroom duplex units (ranging from 107sq.m to 111sq.m); Block 2 (1032sq.m gross floor area): three storey terraced block consisting of 12 duplex/apartment units comprising 6 own door two bedroom apartments at ground floor (ranging from 88sq.m to 91sq.m) and 6 three bedroom duplexes over (ranging from 118sq.m to 120sq.m); Block 3 (1192sq.m gross floor area): three storey terraced block consisting of 14 duplex/apartment units comprising 7 own door two bedroom apartments at ground floor (ranging from 81sq.m to 89sq.m) and 7 three bedroom duplexes over (ranging from 113sq.m to 118sq.m); Block 4, 5 and 6 (488sq.m each): four storey block consisting of 4 duplex units comprising 2 two bedroom duplex units (101sq.m) and 2 three bedroom duplex units (117sq.m) and Block 7 (4110sq.m gross floor area): four storey block consisting of 38 apartment units comprising 8 one bedroom units (54sq.m) and 30 two-bedroom units (ranging from 82sq.m to 90sq.m). Block 7 includes a crèche (652sq.m) and associated play areas. Access will be provided from 3 access points from the approved east-west distributor road that bounds the site to the north ('Shackleton Drive'). The current application includes an additional section of Shackleton Drive (c.200 metres) that is within the applicants' ownership and will make provision for vehicular traffic, online bus services, car parking, pedestrian footpaths and cycle paths to tie in with the approved Shackleton Drive permitted under SDZ16A/0003. (Note: This section of road was previously permitted under Reg Ref: SDZ17A/0006 to facilitate access to lands in Development Area 5 Tubber Lane). The development also includes part (c.450metres) of the north-south road (referred to as 'Central Boulevard' in the Planning Scheme) that will replace Tandy's Lane along the eastern boundary of the site. This road will make provision for vehicular traffic, bus lanes/stops, pedestrian footpaths, cycle paths and 2 access points into the current application site. Permission is also sought for 552 parking spaces, bin storage areas, communal and private open spaces (including balconies, terraces, gardens, courtyards and roof terraces), hard and soft landscaping, boundary treatment and all associated site and development works. One dwelling and associated outbuilding (totalling 94sq.m) located to the south eastern corner of the site, at the bend of Tandy's Lane are to be demolished to accommodate the development. Temporary permission for 3 years is sought for two 4.5m high triangular pylon marketing signs to be erected in the north eastern and south eastern corner of the site addressing 'Shackleton Drive'/Central Boulevard and Central Boulevard respectively. At this site (c.8.85 hectares) at Adamstown, Lucan Co. Dublin. The application relates to part of the lands within Adamstown SDZ Planning Scheme (2014) known as Tobermaclugg Village (Development Area 4) bounded to the north by approved east-west distributor road (approved under Reg Ref: SDZ16A/0003 - under construction) to the south by the proposed Airlie Park Public Open Space, to the east by a new road referred to as Central Boulevard and to the west by undeveloped lands designated in the Planning Scheme as Tobermaclugg Local Centre.
- Location
- Lucan, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SDZ18A/0002
Numbers and dates
- Floor area
- 31,914 m²
- Project type
- Large residential
- Received
- 19 Jan 2018
- Granted
- 15 Mar 2018
- Site start notified
- 3 May 2018
Timeline
- Application received
- Granted
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file SDZ18A/0002 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 3 May 2018Notice filed · phase 1 · The construction of 99 houses on lands at Shackleton, Lucan, Co. Dublin and all roads...View the site start
- 30 May 2018Notice filed · phase 2 · Construction of Block No.1 - a four storey duplex block of 8 units - No's 1-8 Shackleton...View the site start
- 30 May 2018Notice filed · phase 3 · Construction of Block 2 - a three storey duplex block consisting of 12 No. units - 5-18...View the site start
- 23 Jul 2018Notice filed · phase 4 · Construction of 55 Houses at Shackleton, Lucan Co. Dublin - 1-11 Shackleton Square...View the site start
- 29 Aug 2018Notice filed · phase 5 · Block 4 - No's 1-4 Davis Hall, Shackleton, Lucan, Co. Dublin - a four storey duplex...View the site start
- 29 Aug 2018Notice filed · phase 6 · Block 5 - No's 1-4 Ross Gate, Shackleton, Lucan, Co. Dublin - a four storey duplex block...View the site start
- 29 Aug 2018Notice filed · phase 7 · Block 6 - No's 1-4 Wilkes Court, Shackleton, Lucan, Co. Dublin - a four storey duplex...View the site start
- 27 Nov 2018Notice filed · phase 8 · Construction of 30 Houses at Shackleton, Lucan, Co. Dublin. 1-4 Shackleton Lawn, 11-21...View the site start
- 20 Feb 2019Notice filed · phase 9 · Construction of a four storey apartment building consisting of 38 No. apartments and a...View the site start
- 22 Feb 2019Notice filed · phase 10 · Construction of a three storey apartment / duplex residential building consisting of 7...View the site start
- Completion certificate recordedRecorded in May 2018 · 4 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in May 2018 · 25 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in May 2018 · 5 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area