Small residential · Co. Dublin

Tubber Lane, Adamstown, Lucan, Co. Dublin.

Granted 21 Jun 2023

We no longer update this application, so we can't email you about it. Get new planning applications in Lucan by email

Key facts

  • Planning application SDZ23A/0015 at Tubber Lane, Adamstown, Lucan, Co. Dublin.: Amendments to the Phase 2 residential development permitted under…
  • It was received by South Dublin County Council on 27 Apr 2023.
  • Status: Granted 21 Jun 2023.
  • Work was due to start on 27 Sep 2023, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the South Dublin County Council planning register, as last seen on 2 Jun 2026. Open the council's file

More planning applications in Lucan · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 21 Jun 2023.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Amendments to the Phase 2 residential development permitted under…

Amendments to the Phase 2 residential development permitted under Reg. Ref.: SDZ19A/0008, as amended under Reg. Ref.: SDZ20A/0014, currently under construction, at a site located in the Tubber Lane Development Area within the Adamstown SDZ area; The application site, which includes an extension of the site boundary of the parent permission to encompass additional car parking, is located to the south of Tubber Lane Road, in the north-west of the Adamstown SDZ lands; The proposed development relates to amendments to the permitted apartment Block C and Block E to provide for an additional 10 apartments (5 to each block), resulting in a total of 52 apartments within Block C and Block E (26 to each block) consisting of provision of 1 additional floor to the permitted 3 storey corners of Block C and Block E (increasing the building height at the corners from the permitted 3 storeys to 4 storeys facing the Celbridge Link Road and Adamstown Drive); Amendments to the permitted floor layout of Blocks C and Block Eat ground and upper floors, including a minor increase in the permitted building footprints and a reconfiguration of the permitted units, to provide for 16 one bed units and 36 two bed units, in lieu of the permitted 10 one bed units, 28 two bed units, and 4 three bed units; Associated amendments to the permitted building facades, including alterations to fenestration and balconies, elevational materials and finishes; Revisions to the permitted bike and bin storage arrangements, including the provision of external standalone bin and bike stores; Associated amendments to the site layout, open space and landscaping to provide for car and cycle parking, foul and surface water drainage, and all services necessary to facilitate the development; All associated site development and ancillary works; The proposed amendment will increase the total number of residential units within the permitted Phase 2 residential development, as amended, from 162 units to 172 units.

Location
Lucan, Co. Dublin Map
Planning reference
SDZ23A/0015

Numbers and dates

Project type
Small residential
Received
27 Apr 2023
Granted
21 Jun 2023
Site start notified
27 Sep 2023

Timeline

  1. Application received
  2. Granted
  3. Site start notified

Site history

This site's history

  1. Earlier permission SDZ19A/0008 for this site: granted 6 Feb 2020, commencement notice filed for a start on 19 May 2021.

    148 residential units comprising of 12 4-bed, semi-detached houses (Type A); 64 3-bed, terraced houses (Type B, C & D); Apartment Block A… Named in this application's description
  2. Earlier permission SDZ20A/0014 for this site: granted 17 Sep 2020, commencement notice filed for a start on 20 May 2021.

    Amendments to the Phase 2 residential development permitted under Reg Ref: SDZ19A/0008. The proposed amendments relate to permitted house… Named in this application's description

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

Work was due to start on 27 Sep 2023, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file SDZ23A/0015 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 27 Sep 2023Notice filed · phase 1 · Additional floor/Units for Block C Halwell Square.View the site start
  2. 27 Sep 2023Notice filed · phase 2 · Additional floor/Units for Block E Halwell Square.View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Lucan

Get alerts for LucanFree. We email you when new applications appear.

Free email alerts

Get new Lucan projects by email

New applications, decisions and site starts in Lucan, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options