Large residential · Co. Dublin
Within the townland of Cappagh and Clonburris Litte, Clonburris, Co. Dublin
Granted 11 Dec 2023
We no longer update this application, so we can't email you about it. Get new planning applications in Clonburris by email
Key facts
- Planning application SDZ23A/0018 at Within The Townland of Cappagh and Clonburris Litte, Clonburris, Co. Dublin: 565 homes.
- It was received by South Dublin County Council on 1 Nov 2023.
- Status: Granted 11 Dec 2023.
Source: the South Dublin County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Clonburris · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 11 Dec 2023.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
565 homes
7 year Planning Permission for development at site of c. 13.75 hectares (on 2 parcels of land consisting of construction of 565 dwellings (mixture of apartments, duplex apartments and houses) in the Clonburris Development Areas CSW-S1 & CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows a) 230 houses comprising 1 two bedroom house, 217 three bedroom houses and 12 four bedroom houses, all 2 storey (house types H3, H4, H4S, H5, H6 - 3 no. storeys) comprising semi-detached, terraced, end terrace units (with parking, solar panels and private open space); b) 216 duplex apartments/apartments comprising 108 two bedroom units and 108 three bedroom units, in 20 no. 3 no. storey buildings (in a series of 4, 6, 7, 8 & 9 terraced blocks); c) 119 apartments as follows: Block 81 (4 storeys) consists of 72 apartments (33 one bedroom & 39 two bedroom apartments); Block 82 (4 storeys) consists of 47 apartments (17 one bedroom apartments & 30 two bedroom apartments (all apartments to have terrace or balcony); d) Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 to the east; e) Public Open Space/landscaping of c. 3 hectares (to include Grand Canal Park along the southern boundary of the site to connect to existing Grand Canal towpath) as well as a series of communal open spaces to serve apartments and duplex units; f) The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (675 spaces) and bicycle parking (998 spaces), single storey ESB substations/bike/bin stores, green roofs and solar panels at roof level of apartments, and all ancillary site development / construction works; g) Permission is also sought for provision of and connection to water supply foul drainage infrastructure; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 all on wider lands bounded generally by the Dublin-Cork railway line to the north, the Grand Canal to the south, and undeveloped lands to the east and west and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
- Location
- Clonburris, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SDZ23A/0018
Numbers and dates
- Homes
- 565
- Floor area
- 54,376 m²
- Estimated construction value
- €95m to €170mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Received
- 1 Nov 2023
- Granted
- 11 Dec 2023
- Site start
- 18 Sep 2024
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file SDZ23A/0018 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 18 Sep 2024Work started · phase 1 · Construction of 125 no. Dwelling Houses and all ancillary site works on Tile 5 (CSW-S2)...View the site start
- 18 Sep 2024Work started · phase 2 · Construction of 105 no. Dwelling Houses and all ancillary site works on Tile 4 (CSW-S1)...View the site start
- 23 Sep 2024Work started · phase 3 · Construction of 1 no. 4 Storey Apartment Block containing 47 no. Dwellings and all...View the site start
- 23 Sep 2024Work started · phase 4 · Construction of 1 no. 3 Storey Duplex Block containing 8 no. Dwellings and all ancillary...View the site start
- 23 Sep 2024Work started · phase 5 · Construction of 1 no. 3 Storey Duplex Block containing 16 no. Dwellings and all...View the site start
- 23 Sep 2024Work started · phase 6 · Construction of 1 no. 4 Storey Apartment Block containing 72 no. Dwellings and all...View the site start
- 23 Sep 2024Work started · phase 7 · Construction of 1 no. 3 Storey Duplex Block containing 12 no. Dwellings and all...View the site start
- Completion certificate recordedRecorded in Sep 2024 · 8 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 26 Oct 2026.
- Completion certificate recordedRecorded in Sep 2024 · 20 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 26 Oct 2026.
- Completion certificate recordedRecorded in Sep 2024 · 18 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 26 Oct 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area