Mixed use · Co. Dublin
495 homes, Dublin 22, Co. Dublin
Granted 17 Apr 2024
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
Council register
The council's register shows: Granted on 17 Apr 2024.
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
495 homes
Cairn Homes Properties Limited, intend to apply for permission for development at this site of c.5 ha at Development Area 6 Kishoge Urban Centre, sub sector KUC-S4 (including an area of Development Area 9 Kishoge South East, sub sector KSE-S1), Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. the development will consist of the removal of existing hardstanding and the construction of a mixed-use development arranged in 11 no. blocks, ranging between 3 & 7 storeys, comprising: 495 no. residential units, including 449 no. apartments (216 no. 1 bed units, 46 no. 2 bed 3 person units, 187 no. 2 bed 4 person units and 46 no. duplex units (22 no. 2 bed 4 person units and 24 no. 3 bedroom units), arranged across Blocks A-F; 2,502 sq.m of retail floorspace, including 1 no. large 2 storey retail unit (over an undercroft car park) and 2no. independent retail units at ground floor of Block B; 4,607 sq.m of employment floorspace within a 6 storey building and 2 no. independent employment units at ground floor of Block B and a bike hub, located at ground floor of the employment building; 483 sq.m creche, located at ground floor level of Block E; and 87 sq.m cafe, located within the employment building. Vehicular access to the site will be from the Clonburris Southern Link Street(as permitted by Reg. Ref. SDZ20A/0021). The development will also consist of the provision of public open space, including an urban plaza; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, wetland feature, play areas; signage; basement car park (Blocks B-C); undercroft parking (Blocks A, D and retail box) and surface car parking (403 no. spaces in total, including car sharing and accessible spaces; motorcycle parking; electric vehicle charging points); bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including green roofs); open attenuation pons; sustainability measures; signage; public lighting; and all site development and excavation works above and below ground.
- Location
- Dublin 22, Co. Dublin Map
- Council
- South Dublin County Council
- Planning reference
- SDZ23A/0043
Key facts
- Homes
- 495
- Floor area
- 48,636 m²
- Estimated construction value
- €110m to €160mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Mixed use
- Received
- 25 Mar 2024
- Granted
- 17 Apr 2024
- Site start
- 25 Sep 2024
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file SDZ23A/0043 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the South Dublin County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 25 Sep 2024Work started · phase 1 · Block A D Retail is an eight-storey residential and retail unit development consisting...
- 5 Dec 2025Work started · phase 2 · Block EF is a seven-storey over basement mixed use development consisting of basement...
- 6 Mar 2026Work started · phase 3 · Block BC is a six -storey over basement mixed use development consisting of basement car...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.