Large residential · Co. Dublin

84 homes, Dublin 22, Co. Dublin

Granted 17 Sep 2026

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application SDZ25A/0044W at Dublin 22, Co. Dublin: 84 homes.
  • It was received by South Dublin County Council on 24 Aug 2026.
  • Status: Granted 17 Sep 2026.
  • Permission was granted on 17 Sep 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the South Dublin County Council planning register, checked 7 Oct 2026. Open the council's file

More planning applications in Dublin 22 · Planning applications in Co. Dublin

What and where

84 homes

Development at this site (c. 3.74Ha) at the Kishoge Southwest Development Area, including lands located within development sub-sector KSW-S2 and development sub-sector KSW-S4, in the Clonburris Strategic Development Zone (SDZ) within the townland of Grange, Dublin 22. The proposed development will consist of the removal of existing hard standing and associated sub-structures and the construction of 84no. dwelling units consisting of 42no. 2-bed 3p apartments and 42no. 3-bed 5p duplexes arranged across 6no. 3-storey Blocks A-F (9,255 m² GFA) with associated communal amenity space (3,444 m² total) and all ancillary accommodation including bicycle and refuse stores. Vehicular access to development sub-sector KSW-S2 is proposed from the Clonburris Southern Link Street (as permitted under Reg. Ref. SDZ20A/0021) via local roads (as proposed under Pl. Ref. SDZ25X/0001; ACP Ref. 322638) within adjoining development sectors KSW-S1 and KSW-S3 to the north of the subject site. Vehicular access to development sub-sector KSW-S4 is proposed from the Clonburris Southern Link Street (as permitted under Reg. Ref. SDZ20A/0021) via Lynch's Lane. Within development sub-sector KSW-S4, provision is also made for a future vehicular access to directly adjoining lands in development sub-sector KSW-S4 to the east of the subject site. The development will also consist of the provision of public open space including the southern part of Kishoge Linear Park, hard and soft landscaping including internal roads, shared paths and pedestrian pathways and associated connections to adjoining lands, boundary treatments and street furniture; surface car parking (95no. spaces in total, including 5no. accessible spaces and 19no. electric vehicle charging spaces); bicycle parking (252no. spaces in total, including 210no. long-stay resident spaces and 42no. short-stay visitor spaces); 2no. ESB substations; piped infrastructural services and connections; ducting; plant; SuDS measures; attenuation basins; water crossings; water, surface water, and foul drainage infrastructure; public lighting; and all site development and excavation works above and below ground. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.

Location
Dublin 22, Co. Dublin Map
Planning reference
SDZ25A/0044W

Numbers and dates

Homes
84
Floor area
9,333 m²
Estimated construction value
€22m to €29mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Large residential
Received
24 Aug 2026
Granted
17 Sep 2026

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 17 Sep 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file SDZ25A/0044W on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

Reviewed build intelligence

What the documents establish

Government document review

Significant further information revises the KSW-S2/S4 proposal from 84 to 92 homes. The inspected notice and layout establish a revised proposal, not a grant.

3 official documents inspected · Checked 2026-09-07 · Official file index

The revised proposal contains 92 homes in six blocks

Significant FI proposal for KSW-S2/S4

What the evidence says
The August significant-FI notice changes 84 homes to 92 and replaces six three-storey blocks with one four-storey block and five three-storey blocks. It states 1 one-bedroom, 49 two-bedroom and 42 three-bedroom dwellings, with gross floor area revised from 9,255 to 8,348.2 m². Revision A of the site layout also labels 92 homes.

Why it may matter — interpretation
Design and estimating teams need the revised mix, height and floor area together; the larger home count does not mean larger gross floor area.

What is not established
No grant or construction start is established by these selected documents.

Inspect the evidence

Significant further-information site notice · p.1
92 · Issued 2026-08-20 · Notice erection date 20 August; received 21 August; indexed 24 August · Checked 2026-09-07

92

Revised site layout and ground floor layout · p.1
92 RESIDENTIAL UNITS · Issued 2026-06-08 · 21004.PL.300 revision A; received 7 August; catalogue 10 August · Checked 2026-09-07

92 RESIDENTIAL UNITS

The latest layout separates resident and visitor cycle provision

Revised transport provision shown on 21004.PL.300 A

What the evidence says
Revision A schedules 84 car-parking spaces, 225 long-term bicycle places and 46 short-term bicycle places. The notice’s 271 bicycle total combines those two cycle categories; neither is an additional separate total.

Why it may matter — interpretation
Cycle-store suppliers and civil designers can distinguish the secure long-term provision from visitor stands when assessing the scope.

What is not established
Supplier selection, installation and a granted final parking layout remain unverified.

Inspect the evidence

Revised site layout and ground floor layout · p.1
LONG TERM BICYCLE STORE · Issued 2026-06-08 · 21004.PL.300 revision A; received 7 August; catalogue 10 August · Checked 2026-09-07

LONG TERM BICYCLE STORE

Significant further-information site notice · p.1
271 · Issued 2026-08-20 · Notice erection date 20 August; received 21 August; indexed 24 August · Checked 2026-09-07

271

The layout keeps canal frontage and neighbouring links distinct

Application boundary and access interfaces on revision A

What the evidence says
The revised site plan shows six blocks north of the Grand Canal, a pedestrian/cycle shared route along their southern side and potential road/cycle connections at the eastern boundary. It separately labels neighbouring council schemes and the southern link-street infrastructure. Those neighbouring works are contextual interfaces, not extra dwellings under this application.

Why it may matter — interpretation
Civil contractors should distinguish works inside the housing application from interfaces requiring coordination with neighbouring permissions.

What is not established
The plan does not establish delivery of the potential links or completion of neighbouring infrastructure.

Inspect the evidence

Revised site layout and ground floor layout · p.1
POTENTIAL LINK ROAD TO ADJACENT SITE · Issued 2026-06-08 · 21004.PL.300 revision A; received 7 August; catalogue 10 August · Checked 2026-09-07

POTENTIAL LINK ROAD TO ADJACENT SITE
Remaining document questions
  • What council outcome follows the August significant-FI consultation, and which layout revision does it approve?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

How we know this

From the South Dublin County Council planning register, checked 7 Oct 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Dublin 22

Get alerts for Dublin 22Free. We email you when new applications appear.

Free email alerts

Get new Dublin 22 projects by email

New applications, decisions and site starts in Dublin 22, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options