Development Description
16. Tree Protection Prior to the commencement of development, the applicant will submit an arboricultural survey, tree impact plan, and tree protection plan which will include trees protected on the western boundary at proposed southern entrance. The applicant will retain the professional services of a qualified Arboriculturist throughout the life of the site development works. The Arboriculturist will advise and supervise all works associated or in proximity to the existing retained trees to ensure their retention and condition. All trees shown to be retained on the site and adjacent to the site, shall be adequately protected during the period of construction as per BS 5837, such measures to include a protection fence beyond the branch spread, with no construction work or storage carried out within the protective barrier. (The tree protection measures shall have regard to the Guidelines for Open space Development and Taking in Charge, copies of which are available from the Parks and Landscape Services Division).
Map
No coordinates supplied in the public planning feed.