Commercial fit-out, St. Andrew House, 24-34 Exchequer Street, Dublin 2 - Planning Application WEB1772/26
Dublin / Dublin 2 / St. Andrew House, 24-34 Exchequer Street, Dublin 2
Source-linked planning record
Commercial fit-out, St. Andrew House, 24-34 Exchequer Street, Dublin 2 - Planning Application WEB1772/26
Dublin / Dublin 2 / St. Andrew House, 24-34 Exchequer Street, Dublin 2- PB ref
- PB--3229870005
- Plan ref
- WEB1772/26
- Authority
- Dublin City Council
- Stage / date
- Granted / 27 May 2026
- Est. value band
- Value not disclosed
- Project class
- Commercial fit-out
- Promoter
- not available yet
- Architect / agent
- not available yet
Key facts
Lead summary
- Source
- Dublin City Council public planning register
- Planning authority
- Dublin City Council
- Application reference
- WEB1772/26
- Applicant
- not available yet
- Agent
- not available yet
- Decision stage
- Granted
- Decision due
- 27 May 2026
Official description
Verbatim source text
CHANGE OF USE: The development is largely contained to the upper floors of the existing building and includes the doorway, lobby/stairway access on the ground floor. The subject site is located within the South City Retail Architectural Conservation Area (ACA). The development will consist of the development of a 34-no. room hotel within the existing building as follows: 1. Change of use of existing building from office to hotel use and internal reconfiguration to provide for 34 no. double and family guest rooms (all en-suite). 2. Refurbishment of the building entrance onto Exchequer Street, to include 2 no. signs, one on the façade of 1.26m x 0.165m and one above the door of 0.54m x 0.37m. 3. Repair / renewal of all existing windows (including secondary glazing to all windows) and façade restoration of the associated windows and brickwork / stonework. 4. Removal / modification of some elements including of south-eastern secondary staircase; sections of internal walls and doors; and repair of existing roof structure; and addition of new internal walls. 5. Provision of circulation areas, lobby areas, utility areas, staff welfare facilities, linen and refuse storage areas, and plant rooms. 6. Provision of raised internal floor at first floor level to facilitate services. 7. External plant deck to rear lower roof area, and all associated site works above and below ground.
Verify against official sourceProject team
Named source parties
- Promoter
- not available yet
- Planning agent
- not available yet
Lifecycle timeline
Application to site progress
-
Applied
2 Apr 2026 WEB1772/26 -
Decision
Grant Permission 27 May 2026 -
Commenced
No commencement indexed Owner-export and BCMS records are indexed only when a reliable source link exists. -
Completed
Completion not recorded Smaller works often do not require a completion certificate.