86 dwellings, 110 & 114 Howth Road, Dublin 3, D03 KV60 & D03 DE48
We, Matriciana Ltd., intend to apply for Planning Permission for development at this site: 110 & 114, Howth Road, Clontarf, Dublin 3. The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 17 Sep 2025. / Confidence: LowDecision date 17 Sep 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
We, Matriciana Ltd., intend to apply for Planning Permission for development at this site: 110 & 114, Howth Road, Clontarf, Dublin 3. The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m² GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m² GFA) plus ancillary outbuildings (47 m² GFA overall). 2. The construction of a residential development (9,953.66 m² GFA)...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB1842/25
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Mixed use - 86 dwellings
The public application record identifies 86 dwellings in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
We, Matriciana Ltd., intend to apply for Planning Permission for development at this site: 110 & 114, Howth Road, Clontarf, Dublin 3. The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m² GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m² GFA) plus ancillary outbuildings (47 m² GFA overall). 2. The construction of a residential development (9,953.66 m² GFA) consisting of 86 no. apartment units (3 no. studios, 35 no. 1 - bed units, 41 no. 2 - bed units, and 7 no. 3 - bed units) ranging between 4 to 7 storeys in height over basement level. 3. Provision of resident's communal area (38 m² GFA) at ground floor level. 4. Provision of 1 no. Crèche Facility at ground floor level (75 m² GFA) with capacity for 20 no. children and associated, secure, open play area (120.8 m²). 5. Provision of 1 no. Café Unit (50 m² GFA) at ground floor level with associated outdoor seating area. 6. Removal of 2 no. existing vehicular site entrances off Howth Road (R105) and provision of new site access off Howth Road (R105) to serve the development with vehicular, cycling and pedestrian access. 7. The construction of a basement to be accessed off Howth Road (R105) with provision for 46 no. car parking spaces, including accessible and electric vehicle spaces, 2 no. motorcycle parking spaces and 142 no. 'long stay' residential secured bicycle parking spaces. 8. 4 no. surface level car parking spaces (consisting of 2 no. employment parking spaces in connection with the crèche and café and 2 no. additional parking spaces as shared GoCar/ Visitor parking spaces), 1 no. set down area and 1 no. parking space for delivery/ services vehicles. 9. Provision of 142 no. 'long stay' residential secured bicycle parking spaces at basement level together with additional 50 no. visitor bicycle parking spaces in secure locations at surface level throughout the site. 10. All apartments are provided with private terraces / balconies. 11. The scheme provides a total of 3,059.51 m² of open space, consisting of 2,075.55 m² of Communal Open Space (44% of overall site area), 467.86 m² of Public Open Space for community use (10% of overall site area), and 516.1 m² of communal roof terrace gardens at 4th, 5th and 6th floor level for residents (11% of overall site area). 12. Total non-residential use is 163 m² (1.6 % of overall development). 13. Provision of 63.6 m² of Bin Storage, 30 m² of Storage, 34.2 m² of CHP Room and 40 m² of Communications Room (all at basement level). 14. The development will also provide for all associated ancillary site development infrastructure including: public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments and all associated site development and excavation works above and below ground necessary to facilitate the development. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council, Planning Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8 during its public opening hours (9.00a.m.- 4.30p.m.). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.
Application to site progress
-
Applied 15 Apr 2025 WEB1842/25
-
Decision Grant Permission 17 Sep 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB1842/25
We, Matriciana Ltd., intend to apply for Planning Permission for development at this site: 110 & 114, Howth Road, Clontarf, Dublin 3. The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m² GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m² GFA) plus ancillary outbuildings (47 m² GFA overall). 2. The construction of a residential development (9,953.66 m² GFA) consisting of 86 no. apartment units (3 no. studios, 35 no. 1 - bed units, 41 no. 2 - bed units, and 7 no. 3 - bed units) ranging between 4 to 7 storeys in height over basement level. 3. Provision of resident's communal area (38 m² GFA) at ground floor level. 4. Provision of 1 no. Crèche Facility at ground floor level (75 m² GFA) with capacity for 20 no. children and associated, secure, open play area (120.8 m²). 5. Provision of 1 no. Café Unit (50 m² GFA) at ground floor level with associated outdoor seating area. 6. Removal of 2 no. existing vehicular site entrances off Howth Road (R105) and provision of new site access off Howth Road (R105) to serve the development with vehicular, cycling and pedestrian access. 7. The construction of a basement to be accessed off Howth Road (R105) with provision for 46 no. car parking spaces, including accessible and electric vehicle spaces, 2 no. motorcycle parking spaces and 142 no. 'long stay' residential secured bicycle parking spaces. 8. 4 no. surface level car parking spaces (consisting of 2 no. employment parking spaces in connection with the crèche and café and 2 no. additional parking spaces as shared GoCar/ Visitor parking spaces), 1 no. set down area and 1 no. parking space for delivery/ services vehicles. 9. Provision of 142 no. 'long stay' residential secured bicycle parking spaces at basement level together with additional 50 no. visitor bicycle parking spaces in secure locations at surface level throughout the site. 10. All apartments are provided with private terraces / balconies. 11. The scheme provides a total of 3,059.51 m² of open space, consisting of 2,075.55 m² of Communal Open Space (44% of overall site area), 467.86 m² of Public Open Space for community use (10% of overall site area), and 516.1 m² of communal roof terrace gardens at 4th, 5th and 6th floor level for residents (11% of overall site area). 12. Total non-residential use is 163 m² (1.6 % of overall development). 13. Provision of 63.6 m² of Bin Storage, 30 m² of Storage, 34.2 m² of CHP Room and 40 m² of Communications Room (all at basement level). 14. The development will also provide for all associated ancillary site development infrastructure including: public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments and all associated site development and excavation works above and below ground necessary to facilitate the development. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council, Planning Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8 during its public opening hours (9.00a.m.- 4.30p.m.). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.
Open official record