Infrastructure, 42 O'Connell Street Upper and O'Connell Hall, 41 O'Connell...
PROTECTED STRUCTURE: The proposed development comprises the adaptive change of use from former hotel to a private members club, with associated repair and conservation works of existing masonry, external and internal joinery, plasterwork and features of significance; including: External works at No.42 O'Connell Street Upper...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 25 Nov 2025. / Confidence: LowDecision date 25 Nov 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PROTECTED STRUCTURE: The proposed development comprises the adaptive change of use from former hotel to a private members club, with associated repair and conservation works of existing masonry, external and internal joinery, plasterwork and features of significance; including: External works at No.42 O'Connell Street Upper: Temporary access to facilitate works via existing openings through to No.41 O'Connell Street Upper; Permanent repair of the main roof, chimneys, parapets, rooflights and rainwater goods...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB2231/25
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PROTECTED STRUCTURE: The proposed development comprises the adaptive change of use from former hotel to a private members club, with associated repair and conservation works of existing masonry, external and internal joinery, plasterwork and features of significance; including: External works at No.42 O'Connell Street Upper: Temporary access to facilitate works via existing openings through to No.41 O'Connell Street Upper; Permanent repair of the main roof, chimneys, parapets, rooflights and rainwater goods; Front façade structural and brick masonry repair and re-wigging; Rear façade structural repair and replacement of render; and, Perforation of northern gable for opening to connect with the stair/life core. Internal works at No.42 O'Connell Street Upper: Investigative works, including removal of contemporary suspended ceilings at ground floor, removal of non-original, non-load bearing blockwork and partitions, and removal of filled voids at basement; Removal of concrete basement slab; Joinery repair, including main and secondary staircases, wainscotting, fenestration and entrance door; Repair and/or restraint of flat, decorative and vulnerable plasterwork; Cleaning and repair of entrance level flooring; Repair of existing drainage systems where necessary; Removal of sanitaryware and associated pipework at basement level; Provision of new services including heating, lighting, electrical and sanitary facilities; Provision of new fitted bars; and, Application of decorative finishes throughout. Works at the Link Building (located between the existing town house and multi-purpose hall): Careful removal of existing timber roof light truss and sarking boards for reuse within new link building structure; Careful retention of existing basement vault, eastern and southern basement walls; Demolition of remaining link building fabric; Upgrade waterproofing to existing buildings and boundary walls; Minor excavation to the basement to allow for new escape stair; and, Addition of stair/lift core structure to connect the Link with O'Connell Hall. External works at O'Connell Hall: Repair and refurbishment of the roof, all four elevations including the windows. Internal works at O'Connell Hall: Removal of non-original, non-load bearing blockwork and partitions; Removal of concrete slab at ground level; Joinery repair, including staircases, stage structure, wall panelling, floor boards and fenestration; Propping of decorative ceiling and roof light to facilitate repair works; and, Introduction of structural interventions, mechanical and electrical services and fire safety interventions. 41 O'Connell Street Upper: New stair core extension over 5 levels (including basement) connecting to the northern elevation of No. 42 O'Connell Street House projecting into the site at 41 O'Connell Street Upper; Application of temporary mural artwork to the proposed stair core elevations; and, ESB Substation fronting Moore Lane. Moore Lane: Temporary layby/loading bay along Moore Lane to the rear of 42/41 O'Connell Street / O'Connell Hall on the western side of the lane. The application site is within the O'Connell Street Architectural Conservation Area. An Environmental Impact Assessment Report (EIAR) accompanies this application.
Application to site progress
-
Applied 30 May 2025 WEB2231/25
-
Decision Grant Permission 25 Nov 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB2231/25
PROTECTED STRUCTURE: The proposed development comprises the adaptive change of use from former hotel to a private members club, with associated repair and conservation works of existing masonry, external and internal joinery, plasterwork and features of significance; including: External works at No.42 O'Connell Street Upper: Temporary access to facilitate works via existing openings through to No.41 O'Connell Street Upper; Permanent repair of the main roof, chimneys, parapets, rooflights and rainwater goods; Front façade structural and brick masonry repair and re-wigging; Rear façade structural repair and replacement of render; and, Perforation of northern gable for opening to connect with the stair/life core. Internal works at No.42 O'Connell Street Upper: Investigative works, including removal of contemporary suspended ceilings at ground floor, removal of non-original, non-load bearing blockwork and partitions, and removal of filled voids at basement; Removal of concrete basement slab; Joinery repair, including main and secondary staircases, wainscotting, fenestration and entrance door; Repair and/or restraint of flat, decorative and vulnerable plasterwork; Cleaning and repair of entrance level flooring; Repair of existing drainage systems where necessary; Removal of sanitaryware and associated pipework at basement level; Provision of new services including heating, lighting, electrical and sanitary facilities; Provision of new fitted bars; and, Application of decorative finishes throughout. Works at the Link Building (located between the existing town house and multi-purpose hall): Careful removal of existing timber roof light truss and sarking boards for reuse within new link building structure; Careful retention of existing basement vault, eastern and southern basement walls; Demolition of remaining link building fabric; Upgrade waterproofing to existing buildings and boundary walls; Minor excavation to the basement to allow for new escape stair; and, Addition of stair/lift core structure to connect the Link with O'Connell Hall. External works at O'Connell Hall: Repair and refurbishment of the roof, all four elevations including the windows. Internal works at O'Connell Hall: Removal of non-original, non-load bearing blockwork and partitions; Removal of concrete slab at ground level; Joinery repair, including staircases, stage structure, wall panelling, floor boards and fenestration; Propping of decorative ceiling and roof light to facilitate repair works; and, Introduction of structural interventions, mechanical and electrical services and fire safety interventions. 41 O'Connell Street Upper: New stair core extension over 5 levels (including basement) connecting to the northern elevation of No. 42 O'Connell Street House projecting into the site at 41 O'Connell Street Upper; Application of temporary mural artwork to the proposed stair core elevations; and, ESB Substation fronting Moore Lane. Moore Lane: Temporary layby/loading bay along Moore Lane to the rear of 42/41 O'Connell Street / O'Connell Hall on the western side of the lane. The application site is within the O'Connell Street Architectural Conservation Area. An Environmental Impact Assessment Report (EIAR) accompanies this application.