Protected structure, Royal Victoria Eye and Ear Hospital, Adelaide Road, Dublin...
PROTECTED STRUCTURE: The development will consist of The provision of a new passenger lift, accessible from the main entrance, serving from lower ground floor level to first floor level of the main hospital building, a protected structure (RPS Ref. no. 39); The formation of a new passageway through the undercroft space of the...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not available yet
- Planning agent
- not available yet
Application text
PROTECTED STRUCTURE: The development will consist of The provision of a new passenger lift, accessible from the main entrance, serving from lower ground floor level to first floor level of the main hospital building, a protected structure (RPS Ref. no. 39); The formation of a new passageway through the undercroft space of the eastern flight of the main entrance hall stairs to access the proposed new lift; The removal of an area of floor to the existing ground floor consultant’s room, replacing this with a lower area of flooring to provide level access from entrance level to the proposed lift; The provision of cross-corridor doors to lower ground floor level to form a protected lobby around the new lift and stairs flight; The reorganisation of ancillary rooms to the lower ground floor and first floor level arising out of the impact of the new lift shaft; The provision of architectural treatments to and around the proposed lift shaft to the consultant’s room at ground floor level to mitigate the conservation impact of the proposed works; The provision of a new stairs flight linking entrance level to lower ground floor level underneath the eastern flight of the main entrance hall stairs involving removal of a small area of floor; The adjustment of the original main entrance doors of the hospital building to reverse the door swing and facilitate better access to the new lift provided; The replacement of the lift cars and mechanisms to the existing main passenger lift and existing goods lift, and the removal of the existing, non-original, fire rated joinery doors to these lifts as they will no longer be required; Minor ancillary works, such as the making good of finishes, associated with the provision of the above.
Application to site progress
-
Applied 7 Jul 2026 WEB2674/26
-
Decision Application Declared Invalid 8 Jul 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale WEB2674/26
PROTECTED STRUCTURE: The development will consist of The provision of a new passenger lift, accessible from the main entrance, serving from lower ground floor level to first floor level of the main hospital building, a protected structure (RPS Ref. no. 39); The formation of a new passageway through the undercroft space of the eastern flight of the main entrance hall stairs to access the proposed new lift; The removal of an area of floor to the existing ground floor consultant’s room, replacing this with a lower area of flooring to provide level access from entrance level to the proposed lift; The provision of cross-corridor doors to lower ground floor level to form a protected lobby around the new lift and stairs flight; The reorganisation of ancillary rooms to the lower ground floor and first floor level arising out of the impact of the new lift shaft; The provision of architectural treatments to and around the proposed lift shaft to the consultant’s room at ground floor level to mitigate the conservation impact of the proposed works; The provision of a new stairs flight linking entrance level to lower ground floor level underneath the eastern flight of the main entrance hall stairs involving removal of a small area of floor; The adjustment of the original main entrance doors of the hospital building to reverse the door swing and facilitate better access to the new lift provided; The replacement of the lift cars and mechanisms to the existing main passenger lift and existing goods lift, and the removal of the existing, non-original, fire rated joinery doors to these lifts as they will no longer be required; Minor ancillary works, such as the making good of finishes, associated with the provision of the above.