New Application · decision due 17 Sep 2026Pre-decision · not yet granted

Mixed use, Citigroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site...

Dublin · Dublin City Council · Plan WEB2850/26 · PB ref PB-3267852130

We, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing...

Indicative value €30m+ PB indicative band
Units applied for Not listed public application record
Floor area 12,847 m² published reliable figure
Decision due 17 Sep 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Decision-dependent

The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 17 Sep 2026; no procurement timetable is published.

Decision due 17 Sep 2026 / Confidence: Medium
Decision deadline 17 Sep 2026

Public planning decision due date; the authority may update it.

Commencement activity No linked activity indexed

No commencement indexed / A scheme cannot commence under this application before permission.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

We, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: • Partial demolition, removal of existing facades and extension of existing 5-6 storeys office...

Ref WEB2850/26 Source-linked Official application description for exact planning reference WEB2850/26

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Dublin City Council
Exact reference
WEB2850/26
Evidence reviewed
9 Aug 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Mixed use

Mixed use

The public application record identifies mixed use in the submitted planning scope.

WEB2850/26Explicit application record
Parking

Basement-parking scope

The public application description explicitly references basement-parking scope.

WEB2850/26Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not available yet
Planning agent
not available yet
Official description

Application text

We, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: • Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; • The resulting proposed extended development (c. 60,119 sq.m) ranges in height from 6 no. to 12 no. storeys in height over existing basement comprising office accommodation, 2 no. hotels, a retail/café unit and a community space; • The proposed development comprises 4 no. blocks: o Block A (6-11 storeys) comprises office accommodation. o Block B (12 no. storeys) comprises office accommodation. o Block C (10 storeys) will comprise a hotel with 201 no. bedrooms; o Block D (6-7 storeys) will comprise a hotel with 135 no. bedrooms; o It is noted that there will be a change of use of part of the existing retained floor area from office to hotel (c. 12,847 m²) to accommodate the proposed hotels. • 1 no. retail/cafe unit (91 sq.m) is provided within Block D at ground floor level; • 1 no. internal community space (654 sq.m) is provided at ground floor level; • A shared entrance for Blocks C and D; • Provision of a shared atrium between Block C and Block D; • Outdoor terraces at 5th, 6th, 7th, 9th, and 11th floor levels; • Green roofs and blue roofs are provided across the scheme; • 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; • 456 no. bicycle spaces (inc. and 4 no. motorcycle spaces are proposed at basement level; • 18 no. short-stay bicycle space (9 no. Sheffield stands) are proposed at surface level; • The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sq.m) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay; • Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; • All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
PlanningCouncil planning register
  1. Applied 24 Jul 2026 WEB2850/26
  2. Decision Decision not recorded yet
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale WEB2850/26

We, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: • Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; • The resulting proposed extended development (c. 60,119 sq.m) ranges in height from 6 no. to 12 no. storeys in height over existing basement comprising office accommodation, 2 no. hotels, a retail/café unit and a community space; • The proposed development comprises 4 no. blocks: o Block A (6-11 storeys) comprises office accommodation. o Block B (12 no. storeys) comprises office accommodation. o Block C (10 storeys) will comprise a hotel with 201 no. bedrooms; o Block D (6-7 storeys) will comprise a hotel with 135 no. bedrooms; o It is noted that there will be a change of use of part of the existing retained floor area from office to hotel (c. 12,847 m²) to accommodate the proposed hotels. • 1 no. retail/cafe unit (91 sq.m) is provided within Block D at ground floor level; • 1 no. internal community space (654 sq.m) is provided at ground floor level; • A shared entrance for Blocks C and D; • Provision of a shared atrium between Block C and Block D; • Outdoor terraces at 5th, 6th, 7th, 9th, and 11th floor levels; • Green roofs and blue roofs are provided across the scheme; • 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; • 456 no. bicycle spaces (inc. and 4 no. motorcycle spaces are proposed at basement level; • 18 no. short-stay bicycle space (9 no. Sheffield stands) are proposed at surface level; • The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sq.m) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay; • Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; • All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.

AuthorityDublin City Council
ReferenceWEB2850/26
StatusChecked 9 Aug 2026
Open official record