Save this project to account

Protected structure · Co. Dublin

Fumbally Square and Fumbally Court Fumbally Lane Dublin 8

Granted 23 Sep 2026

What and where

PROTECTED STRUCTURE

PROTECTED STRUCTURE, CHANGE OF USE: The proposed development relates to two adjacent sites on Fumbally Lane including Fumbally Studio Building and Fumbally Mews Building within the Fumbally Square site, located to the north of Fumbally Lane and southwest of New Street, and the East Court Building (known as Tower 3 & 4) of the Fumbally Court site, located to the south of Fumbally Lane and to the north of Malpas Street, Dublin 8. The application includes the East Court Building which is a Protected Structure at 9 Fumbally Lane (RPS No. 3000, a stone warehouse) and sits as part of a wider site which contains a Protected Structure at 12 Fumbally Lane (RPS No. 3001, entrance walls and stone setts). The proposed development relates to Phase 2 of a current planning application (DCC Reg. Ref. 1823/26) for Phase 1 of the development of an aparthotel on the wider site. In respect of the Fumbally Studio Building the change of use only relates to the ground and first floors and the residential units located on the second and third floors are not subject of this application. The proposed development generally consists of a change of use from office use to aparthotel and the required works to facilitate the development of 50-no. aparthotel rooms. The current proposed Phase 1 contains 172 no. aparthotel rooms with the addition of Phase 2 this would result in an overall aparthotel of 222-no. rooms. The development will consist of provision of 50-no. aparthotel rooms, within the existing buildings, as follows: 1. Change of use of the existing 3 no. buildings from office use to aparthotel rooms as follows: • Fumbally Studio (Ground and First Floor only): this building will contain 14 no. rooms. The existing residential accommodation located at second and third floor level within Fumbally Studio remains unchanged and is unaffected by the proposed development; • Fumbally Mews: this building will contain 5 no. rooms; • The East Court Building: this building will contain 31 no. rooms. An entrance lobby, aparthotel rooms, back of house and plant areas are provided at ground floor level. The proposed works are contained within the existing building envelopes, with no increase in building height or overall floor area proposed. 2. In respect of the East Court Building (a Protected Structure, RPS No. 3000), the aparthotel will utilise the existing office entrance arrangement, staircase and platform lift, preserving the established circulation hierarchy. Existing stairwells are retained and upgraded where necessary. A new staircase is proposed within the existing stairwell of the North Tower and a further replacement stair within the Malpas Street building to provide compliant escape routes and improved circulation. A new passenger lift is also proposed to serve the upper level of the North Tower. Its location has been carefully selected to avoid impacts on primary structural elements, with the lift shaft positioned between existing floor beams to minimise intervention. The existing polycarbonate rooflight of the Kiln Room will be replaced with two steel and glass rooflights. 3. In respect of the Fumbally Studio and Fumbally Mews, existing openings will be utilised wherever feasible, reducing the need for structural intervention. A limited number of new window openings are proposed within Fumbally Studio, on the east elevation. Existing circulation routes and staircases are retained and adapted where possible to support accessibility, fire safety and operational requirements. 4. In addition, the proposed development includes the provision of a publicly accessible sauna and thermal spa facility of c. 143 sq.m within the ground floor of the East Court fronting onto Malpas Street. New elements, including sauna spaces, cold plunge, relaxation areas, changing facilities and associated services, are arranged to work with the existing structure. 5. Staff cycle parking, staff areas and back of house to serve Phase 2 are located within the basement of the Fumbally Square Building as proposed in the Phase 1 application. Use of existing and upgraded plant and other ancillary facilities at ground level to service the buildings. Amendments to the courtyard of Fumbally Court to include for ancillary screened plant areas and landscaping.

Location
Co. Dublin Map
Planning reference
WEB2916/26

Key facts

Floor area
143 m²
Indicative value
€250k–500kPlanningBrief estimate
Project type
Protected structure
Received
31 Jul 2026
Granted
23 Sep 2026
Protected structure
Yes, RPS 3000

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 23 Sep 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file WEB2916/26 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Dublin City Council planning register, checked 30 Sep 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Co. Dublin

Get alerts for Co. DublinFree. We email you when new applications appear.

Free email alerts

Get new Dublin projects by email

New planning applications, decisions and site starts in Co. Dublin. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options