Protected structure · Co. Dublin
Saint Andrew's Resource Centre, 114-116 Pearse Street, Dublin 2
Decision: Additional information (30 Sep 2026)
Key facts
- Planning application WEB2965/26 at Saint Andrew's Resource Centre, 114-116 Pearse Street, Dublin 2: PROTECTED STRUCTURE.
- The applicant is St. Andrew'S Resource Centre. The agent is Suzanne Moloney.
- It was received by Dublin City Council on 10 Aug 2026.
- Decision: Additional information (30 Sep 2026).
Source: the Dublin City Council planning register, checked 5 Oct 2026. Open the council's file
More planning applications in Dublin 2 · Planning applications in Co. Dublin
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
What and where
PROTECTED STRUCTURE
PROTECTED STRUCTURE: The development will consist of the extension and alteration of the Protected Structure (RPS Ref. No. 6513) at St. Andrew's Resource Centre, 114–116 Pearse Street, Dublin 2 comprising of a new single-storey contemporary flat roof extension (62 sq.m) to the rear of the existing later western wing; internal and external alterations to the existing building (426.5 sq.m affected) to provide enlarged day centre accommodation including a reconfigured reception area, upgraded café, staff facilities, offices, kitchen, laundry and additional toilet facilities; works to improve universal access and fire safety including a new external entrance ramp, steps and entrance portal to Pearse Street, modifications to the existing non-original boundary wall with relocation of the vehicular entrance, minor alterations to the existing original gates and railings, replacement of the existing non-original entrance doors with a new entrance door and associated internal entrance lobby alterations, installation of a new lift within the existing original western stairwell, and a new automatic opening vent at roof level; internal alterations including the partial removal of internal walls and partitions, the formation of new structural openings, the partial removal of sections of the external masonry wall, windows and doors within the existing later western wing to form a connection to the proposed extension including associated repair and reinstatement works; and external works including upgrades to the rear courtyard with new hard and soft landscaping and level access, relocation of existing external gas services below ground, repair and reinstatement of affected finishes, and all associated site development works.
- Location
- Dublin 2, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- WEB2965/26
- Application type
- Permission
- Applicant
- St. Andrew'S Resource Centre
- Agent
- Suzanne Moloney
Numbers and dates
- Floor area
- 488 m²
- Project type
- Protected structure
- Received
- 10 Aug 2026
- Decision made
- 30 Sep 2026
- Protected structure
- Yes
Timeline
- Application received
- Council decision
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file WEB2965/26 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Dublin City Council planning register, checked 5 Oct 2026. We link to the council's own file so you can check the official record before you act.
Explore the area