New Application · decision due 2 Nov 2026Pre-decision · not yet granted

Infrastructure, Irish Bitumen Storage Limited, Alexandra Road, Dublin Port, Dublin 1

Dublin 1, Dublin · Dublin City Council · Plan WEB3216/26 · PB ref PB-2284058960

The development consists of removal of twelve bitumen & lubricant oil storage tanks with total capacity 3105m³, removal of the associated equipment and removal of a control room building, followed by the installation of a new bitumen storage tank 28m in diameter and 13.45m in height with a volume of approximately 8275 m³, and...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 2 Nov 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Decision-dependent

The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 2 Nov 2026; no procurement timetable is published.

Decision due 2 Nov 2026 / Confidence: Medium
Decision deadline 2 Nov 2026

Public planning decision due date; the authority may update it.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / A scheme cannot commence under this application before permission.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

The development consists of removal of twelve bitumen & lubricant oil storage tanks with total capacity 3105m³, removal of the associated equipment and removal of a control room building, followed by the installation of a new bitumen storage tank 28m in diameter and 13.45m in height with a volume of approximately 8275 m³, and installation of a pump platform.

Ref WEB3216/26 Source-linked Official application description for exact planning reference WEB3216/26
Open scope evidence

Public source roles

Irish Bitumen Storage Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
Dublin City Council
Exact reference
WEB3216/26
Evidence reviewed
22 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

WEB3216/26Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Irish Bitumen Storage Ltd
Planning agent
Davin Breathnach
Official description

Application text

The development consists of removal of twelve bitumen & lubricant oil storage tanks with total capacity 3105m³, removal of the associated equipment and removal of a control room building, followed by the installation of a new bitumen storage tank 28m in diameter and 13.45m in height with a volume of approximately 8275 m³, and installation of a pump platform.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale WEB3216/26

The development consists of removal of twelve bitumen & lubricant oil storage tanks with total capacity 3105m³, removal of the associated equipment and removal of a control room building, followed by the installation of a new bitumen storage tank 28m in diameter and 13.45m in height with a volume of approximately 8275 m³, and installation of a pump platform.

AuthorityDublin City Council
ReferenceWEB3216/26
StatusChecked 22 Sep 2026
Open official record