Protected structure · Co. Dublin

171, Clontarf Road, Dublin 3

Decision due 4 Dec 2026

Get updates on this application

We'll email you when the council decides, if the decision is appealed, and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application WEB3507/26 at 171, Clontarf Road, Dublin 3: PROTECTED STRUCTURE.
  • The applicant is David & Karen Doyle. The agent is Wilson Hill Architects.
  • It was received by Dublin City Council on 12 Oct 2026.
  • Status: Decision due 4 Dec 2026.
  • The council's decision is due on 4 Dec 2026. Building work can only follow a grant of permission.

Source: the Dublin City Council planning register, checked 15 Oct 2026. Open the council's file

More planning applications in Dublin 3 · Planning applications in Co. Dublin

What and where

PROTECTED STRUCTURE

PROTECTED STRUCTURE - 171 Clontarf Road, Clontarf, D03 E4H3, a protected structure rps. 1945. The development will consist of: A). The replacement of the existing non-original windows to the front and part to the rear with new slim-lite double glazed timber sash windows. B). Thermal upgrade and reinstatement of original slates to the existing bay-window at the front, and the replacement of the non-original windows to same. C). Local repairs to the existing internal walls with lime plaster. D). The removal of the existing non-original conservatory at the rear. E). The construction of a new single-storey flat roof extension to the rear with associated rooflight and fenestration. F). Restoration works to the existing non-original rear extension sloped roof. G). A new conservation rooflight to the rear slope of existing dwelling roof. H). New PV panels to the existing dwelling inner-slop rear roof. I). New PV panels to the existing dwelling outer-slop front roof. J). Internal and fenestration alterations to the existing non-original rear extension. K). Rewiring and replumbing of the existing structure as required. L). Installation of new bin store to the front garden. M). All ancillary site, boundary and landscaping works.

Location
Dublin 3, Co. Dublin Map
Planning reference
WEB3507/26
Application type
Permission
Applicant
David & Karen Doyle
Council planning fileGet alerts

Numbers and dates

Project type
Protected structure
Received
12 Oct 2026
Decision due
4 Dec 2026
Protected structure
Yes

Outlook

What happens next

The council's decision is due on 4 Dec 2026. Building work can only follow a grant of permission.

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file WEB3507/26 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Dublin City Council planning register, checked 15 Oct 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Dublin 3

Get alerts for Dublin 3Free. We email you when new applications appear.

Free email alerts

Get new Dublin 3 projects by email

New applications, decisions and site starts in Dublin 3, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options