Development Description
PROTECTED STRUCTURE: The proposed development consists of the permission for the continuation of the Temporary Pavilion in New Square, and the continuation of and temporary fit-out works to and change of use of the Printing House, to allow both to operate as exhibition space, as permitted under DCC Reg. Ref.: 4785/22, for a period of eight years. This includes for 1. Continuation of temporary fit-out works to the Printing House, and a temporary change of use for to allow it to operate as an exhibition space to include: • A temporary fit-out, to the Printing House (360m2), which incorporates exhibition space, storage rooms, office, and WC at ground floor level and associated plant space at basement level. The temporary fit-out works include the installation of demountable reversible steel and concrete structures, metal stud partitions, timber and steel doors, fire curtain, blockwork walls, and associated services including sprinkler system, ventilation, heating, cooling, information technology and electrical systems. • A demountable steel temporary structure (29 sq.m) along the eastern edge of the Printing House to provide an accessible entrance through an existing doorway, involving widening of the door opening. • All other permitted refurbishment works permitted, and agreed under compliance with DCC, under DCC Reg. Ref.: 4785/22 have been implemented. 2. The continuation of the in place Temporary Pavilion in New Square which has a gross internal area of c.900m2 comprising of an exhibition space (576m2), retail space (170m2), WCs, staff room, storage, plant area and external landscaping.
Map
No coordinates supplied in the public planning feed.