Public / civic · Co. Dublin
Catholic University School, 89-92 Leeson Street Lower, Dublin 2
Granted 3 Nov 2025 (final grant issued 8 Dec 2025)
Key facts
- Planning application WEB5088/25 at Catholic University School, 89-92 Leeson Street Lower, Dublin 2: Modifications to the previously approved proposal [under Dublin City…
- It was received by Dublin City Council on 9 Sep 2025.
- Status: Granted 3 Nov 2025 (final grant issued 8 Dec 2025).
- Permission was granted on 3 Nov 2025 and the final grant issued on 8 Dec 2025. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Dublin City Council planning register, checked 2 Jun 2026. Search the council's register
More planning applications in Dublin 2 · Planning applications in Co. Dublin
What and where
Modifications to the previously approved proposal [under Dublin City…
PROTECTED STRUCTURE: Permission is sought by The Marist Educational Authority for modifications to the previously approved proposal [under Dublin City Council Reg.Ref. 5010/22] for the redevelopment of the existing three storey Canteen and Classroom Building in the south/east corner of the campus at Catholic University School [CUS] 89, 90, 91and 92 Leeson Street Lower, Dublin2. Numbers 89, 90, 91 + 92 Leeson Street Lower are Protected Structures – Ref numbers 4444, 4445, 4446, 4447 in the DCC Record of Protected Structures. The approved building consisted of a Gym at basement level, with an access tunnel link to the Administration building, and the equivalent of five floors overhead. The new proposal consists of constructing the Gym at ground floor level with the equivalent of four floors overhead. The access tunnel link is removed as is the fifth floor. The parapet height of the proposed building will line with the apex of the gable to the Examination Hall and will be circa 305mm higher than the previously approved building. Accommodation will consist of a Gym with equipment storage rooms at ground floor level, changing rooms at mezzanine and first floor levels, 2No. Classrooms + 2No. Science Rooms at second and third floor levels. Other ancillary spaces, including Toilets, Locker areas and Science Preparation rooms, are to be provided at each level as appropriate. To facilitate means of escape from the new ground floor Gym, escape doors are to be provided at the eastern end to Quinn’s Lane, the western end to Stable Lane, and the northern end to the school yard. A fireman’s entrance is to be provided in the staircase to allow access from Quinn’s Lane. There are no works envisaged to the Examination Hall.
- Location
- Dublin 2, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- WEB5088/25
Numbers and dates
- Project type
- Public / civic
- Received
- 9 Sep 2025
- Decision to grant
- 3 Nov 2025
- Final grant
- 8 Dec 2025
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
Site history
This site's history
-
Earlier permission 5010/22 for this site: granted 27 Apr 2023, commencement notice filed for a start on 23 Jan 2025.
PROTECTED STRUCTURE: The works include the removal of the two storey prefabricated buildings on the northern side of the campus to… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference WEB5088/25.Search the register
How we know this
From the Dublin City Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Explore the area