Demolition · Co. Dublin

11. The applicant shall comply with the following conditions from the…, Co. Dublin

Decision due 26 Nov 2026

Get updates on this application

We'll email you when the council decides, if the decision is appealed, and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application WEB5106/25Sub05 at Co. Dublin: The applicant shall comply with the following conditions…
  • The applicant is Red Rock Donnybrook Ltd. The agent is Keystone Partners.
  • It was received by Dublin City Council on 2 Oct 2026.
  • Status: Decision due 26 Nov 2026.
  • The council's decision is due on 26 Nov 2026. Building work can only follow a grant of permission.

Source: the Dublin City Council planning register, checked 18 Oct 2026. Open the council's file

More planning applications in D04k3t8. The Proposals Comprise The Demolition Of Existing Buildings And Structures · Planning applications in Co. Dublin

What and where

11. The applicant shall comply with the following conditions from the…

11. The applicant shall comply with the following conditions from the Transportation Planning Division: (b) The commencement of the development shall be managed in accordance with a Construction Management Plan, which shall be submitted to, and agreed in writing with, the planning authority prior to commencement of development. This plan shall provide details of intended construction practice for the development, including: ii) A Demolition Management Plan, providing details of intended demolition practice for the development, including traffic management, hours of working, noise and dust management measures and off-site disposal of demolition waste; iii) Location of the site and materials compound(s), including areas identified for the storage of construction refuse; iv) Location of areas for construction site offices and staff facilities; v) Details of site security fencing and hoardings; vi) Details of on-site car parking including cycle parking facilities for site workers during the course of construction; vii) Details of the timing and routing of construction traffic to and from the construction site and associated directional signage, to include proposals to facilitate the delivery of abnormal loads to the site, and details of how to management cumulative traffic impacts with adjacent construction sites; viii) Measures to obviate queuing of construction traffic on the adjoining road network; ix) Measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network; x) Alternative arrangements to be put in place for pedestrians, cyclists and vehicles in the case of the closure of any public road or footpath during the course of site development works; xi) Details of appropriate measures to mitigate vibration from construction activity in accordance with relevant standards, and for the monitoring of such levels. xii) Details of appropriate mitigation measures for noise and dust, and monitoring of such levels; xiii) Containment of all construction-related fuel and oil within specially constructed bunds to ensure that fuel spillages are fully contained. Such bunds shall be roofed to exclude rainwater; xiv) Off-site disposal of construction/demolition waste and details of how it is proposed to manage excavated soil; xv) Means to ensure that surface water run-off is controlled such that no silt or other pollutants enter local surface water sewers or drains; xvi) A record of daily checks that the works are being undertaken in accordance with the Construction Management Plan shall be kept for inspection by the planning authority. xvii) The Construction Management Plan shall specifically address any points raised by prescribed bodies and the applicant shall liaise with them during the development process.

Location
Co. Dublin Map
Planning reference
WEB5106/25Sub05
Council planning fileGet alerts

Numbers and dates

Project type
Demolition
Received
2 Oct 2026
Decision due
26 Nov 2026

Site history

This site's history

  1. Application WEB5106/25Sub07 at the same address: received 5 Oct 2026, no decision recorded yet.

    11. The applicant shall comply with the following conditions from the Transportation Planning Division: (d) The applicant/developer shall… Same address
  2. Application WEB5106/25Sub06 at the same address: received 5 Oct 2026, no decision recorded yet.

    10. Prior to the commencement of development a landscape scheme prepared by a Landscape Architect appointed by the applicant shall be… Same address

Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.

Outlook

What happens next

The council's decision is due on 26 Nov 2026. Building work can only follow a grant of permission.

Work packages named so far

  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file WEB5106/25Sub05 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Dublin City Council planning register, checked 18 Oct 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Co. Dublin

Get alerts for D04k3t8. The Proposals Comprise The Demolition Of Existing Buildings And StructuresFree. We email you when new applications appear.

Free email alerts

Get new D04k3t8. The Proposals Comprise The Demolition Of Existing Buildings And Structures projects by email

New applications, decisions and site starts in D04k3t8. The Proposals Comprise The Demolition Of Existing Buildings And Structures, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options