Protected structure · Co. Dublin

37, Belgrave Road, Ranelagh, Dublin 6

Granted 8 Jan 2026 (final grant issued 24 Mar 2026)

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application WEB5128/25 at 37, Belgrave Road, Ranelagh, Dublin 6: PROTECTED STRUCTURE.
  • It was received by Dublin City Council on 12 Sep 2025.
  • Status: Granted 8 Jan 2026 (final grant issued 24 Mar 2026).
  • Permission was granted on 8 Jan 2026 and the final grant issued on 24 Mar 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Dublin City Council planning register, checked 2 Jun 2026. Search the council's register

More planning applications in Dublin 6 · Planning applications in Co. Dublin

What and where

PROTECTED STRUCTURE

PROTECTED STRUCTURE - The development will consist of: renovation, refurbishment and extension of the main building, consisting of a site area of 0.0328 ha. Also to include the construction of a new 3 bedroom family dwelling to the rear of the property, facing onto and with independent direct access to Killeen Road. Works to the main building include: (a) Demolition of non-original rear single storey extension and 1 no shed. (b) Removal of non-original pebble dash sand and cement render to side and rear elevations and replacement with breathable lime render. (c) Restoration of existing timber sash windows and shutters, replacement of non-original glass panes with Histo-Glass or similar approved conservation glazing and energy upgrade. (d) Repointing and cleaning of brickwork to front façade. (e) Reinstatement of original window & door openings to rear ground floor kitchen and dining rooms. (f) New ground floor WC & Utility in Entrance Lobby. (g) New first floor extension over existing side return entrance lobby with pitched roof to match existing building, to provide ensuite bathrooms and storage to two bedrooms (h) Provision for two new rooflights over main stairs and one over master bathroom within double pitch roof valley. (i) Removal of non-original windows to side elevation and rooflight over existing bathroom at first floor level facing onto Killeen Road. (j) Repair and refurbishment of surviving historic fabric in the house including decorative plasterwork, joinery and staircase. Any other historic plasterwork and joinery that has been previously stripped out is to be replaced with historically accurate plasterwork and joinery. (k) Repair of historically accurate chimney pieces. (l) Various landscaping in rear garden including new garden dividing boundary wall in brick/stone. (m) Various landscaping in front garden including, bin and bike storage structure, creation of car parking bay with electric car charging points and 2.6 m wide vehicular entrance opening onto Killeen Road with cast-iron gates incorporating existing cast-iron railings and granite capping on top of granite stone boundary wall, including dishing of pathway kerb, to the side of the property on Killeen Road. (n) Works will also include the construction of a new two-storey dwelling with set-back second floor roof level along the east site boundary facing onto Killeen Road, comprising open plan kitchen, living and dining room, WC and Entrance Lobby at ground floor, two bedrooms, a terrace accessible from the rear bedroom, a bathroom at first floor, and master bedroom with ensuite and set-back roof terrace at second floor, with a dedicated side access. Careful removal and reuse of material of part side boundary wall to accommodate dwelling onto Killeen Road. The development will include all associated site works, landscaping, and boundary treatments. (o) To include repair, refurbishment, renovation and alterations to the existing main building, including all associated site works.

Location
Dublin 6, Co. Dublin Map
Planning reference
WEB5128/25

Numbers and dates

Homes
1
Project type
Protected structure
Received
12 Sep 2025
Decision to grant
8 Jan 2026
Final grant
24 Mar 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant
  3. Appeal lodged
  4. Appeal decidedAppeal withdrawn S.140(1)(a)

Outlook

What happens next

Permission was granted on 8 Jan 2026 and the final grant issued on 24 Mar 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Dublin City Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Dublin 6

Get alerts for Dublin 6Free. We email you when new applications appear.

Free email alerts

Get new Dublin 6 projects by email

New applications, decisions and site starts in Dublin 6, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options