Back to leads
Granted

Infrastructure, City Block No. 9, North Wall Quay and Mayor Street Upper, Dublin 1 - Planning Application WEBDSDZ1646/26

Dublin / Dublin 1 / City Block No. 9, North Wall Quay and Mayor Street Upper, Dublin 1

Est. value €30m+
Units Not listed
Floor area 12,684 m²
Decision 12 Jun 2026

Source-linked planning record

Infrastructure, City Block No. 9, North Wall Quay and Mayor Street Upper, Dublin 1 - Planning Application WEBDSDZ1646/26

Dublin / Dublin 1 / City Block No. 9, North Wall Quay and Mayor Street Upper, Dublin 1
PB ref
PB-10751393969
Plan ref
WEBDSDZ1646/26
Authority
Dublin City Council
Stage / date
Granted / 12 Jun 2026
Est. value band
€30m+
Units / floor
12,684 m²
Project class
Infrastructure
Promoter
not included in reference feed
Architect / agent
not included in reference feed

Source: /organisations/dublin-city-council/

Key facts

Lead summary

Source
Dublin City Council public planning register
Planning authority
Dublin City Council
Application reference
WEBDSDZ1646/26
Applicant
not included in reference feed
Agent
not included in reference feed
Decision stage
Granted
Decision
12 Jun 2026
Floor area
12,684 m²

Official description

Verbatim source text

Waterside Block 9 Developments Limited intends to apply for planning permission for development on this site of c. 0.22 hectares located within City Block No. 9 (of the North Lotts & Grand Canal Dock Strategic Development Zone Planning Scheme, 2014), North Wall Quay and Mayor Street Upper, Dublin 1. The proposed development comprises the replacement of a previously-permitted commercial office building (Block No. 1, permitted under Reg. Ref. DSDZ5296/22 (“Scheme 9”)) with an aparthotel development and associated ancillary uses. (For the purposes of identification, we reference this proposal as “Scheme 18”.) The development will consist of: 1. The construction of an eight-storey aparthotel building (comprising 288 No. bedrooms) over basement (annotated as Lower Ground and Lower Ground Mezzanine levels), with a total gross floor area of 12,684 sq m. Due to the inclusion of lower ground levels, the building will present as ten storeys on the eastern elevation and eight storeys on the surrounding streets, in accordance with the North Lotts & Grand Canal Dock Planning Scheme 2014 (as amended). 2. Provision of a publicly accessible café/lounge at ground floor level, including flexible “black box” space to accommodate evening and night-time uses, an ancillary gym at lower ground level, an electricity substation, and associated back-of-house facilities including kitchen, servicing, deliveries and waste management areas. 3. Provision of 23 No. bicycle parking spaces, comprising 12 No. long-stay spaces internally and 11 No. short-stay visitor spaces externally (including 1 No. cargo bicycle space). 4. Provision of an external landscaped area at lower ground level to the east of the building. 5. Minor adjustment to external ground levels (from 4.0m OD to 4.1m OD) to align with the adjoining permitted Block No. 2 development (Reg. Ref. WEBDSDZ1931/25). 6. Provision of associated signage, plant at roof level, and all ancillary site development works above and below ground. The proposed aparthotel development will replace the previously-permitted Block No. 1 office building (11,916 sq m). The remainder of City Block No. 9 (including permitted Blocks No. 2 and No. 3) is not affected by this application. The site is bounded by Mayor Street Upper to the north, Castleforbes Road to the west, permitted Block No. 2 to the south, and adjoining lands within City Block No. 9 to the east.

Verify against official source

Project team

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed

Lifecycle timeline

Application to site progress

  1. Applied

    19 Mar 2026 WEBDSDZ1646/26
  2. Decision

    Grant Permission 12 Jun 2026
  3. Commenced

    No commencement indexed Owner-export and BCMS records are indexed only when a reliable source link exists.
  4. Completed

    Completion not recorded Smaller works often do not require a completion certificate.

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceElectricalGroundworksHealth & SafetyMain contractorMechanicalSolar/Energy
Board this lead Create alert