Save this project to account

Planning record · Co. Dublin

Hartfield Place, Swords Road, Whitehall, Dublin 9, D09 C7F8

Decision due 6 Nov 2026

What and where

7. The following Environmental Health Section requirements of the…

7. The following Environmental Health Section requirements of the Planning Authority shall be complied with: (i) A Construction Management Plan shall be included as part of this application prepared by the awarded contractor. This plan shall be developed with reference to the Air Quality Monitoring and Noise Control Unit’s Good Practice Guide for Construction and Demolition produced by the Air Quality Monitoring and Noise Control Unit of Dublin City Council. This unit requires that the measures for “High Risk” sites contained in the Air Quality Monitoring and Noise Control Unit’s Good Practice Guide for Construction and Demolition be added to the measures contained in the Construction management Plan, or a signed statement on head of paper submitted on behalf of the awarded contractor, stating adherence to measures for high risk sites contained within the document. This shall be submitted to the Air Quality Monitoring & Noise Control Unit for reviewing before works commence. Any dust monitoring onsite shall be real-time dust monitoring, as opposed to the Bergerhoff method. This is contained within the guidance document above. (ii) Due to the proximity to local residents and other sensitive receptors such as Highfield Hospital to the south and Beechlawn Nursing home to the east and the likely use of generators to provide power to the cranes, this unit would recommend placing generators at the least intrusive location. This unit also recommends these generators have acoustic barriers/enclosures built around them in order to reduce sound levels at the nearest noise sensitive receptors. This shall be included within the Construction Management Plan for the site. (iii) The hours of operation during the demolition and construction phase shall be restricted to 7.00am to 6pm, Monday to Friday, and 8.00am to 2.00pm on Saturdays. Permission to work outside of these hours must be subject to the approval of Dublin City Council (B) Noise Control Recommended Conditions and Comments regarding retail/cafe units (i) The LAeq level measured over 15 minutes (daytime) or 5 minutes (nighttime) at a noise sensitive premises when plant is operating shall not exceed the LA90 (15 minutes day or 5 minutes night), by 5 decibels or more, measured from the same position, under the same conditions and during a comparable period with no plant in operation. (ii) Noise levels should not be so loud, so continuous, so repeated, of such duration or pitch or occurring at such times as to give reasonable cause for annoyance to a person in any premises in the neighbourhood or to a person lawfully using any public place. (C) Air Quality Control –General Recommended Conditions and Comments regarding retail/cafe units (i) All emissions to air associated with the development must be free from offensive odour and shall not result in an impairment of or an interference with amenities or the environment. (ii) A suitably qualified and experienced person should undertake the design and installation of the ventilation system (iii) A suitable filtration system must be installed to neutralise odours prior to their discharge (iv) The ventilation/extraction systems should be designed and be so sited to ensure the emissions will cause no nuisance.

Location
Dublin 9, Co. Dublin Map
Planning reference
WEBLRD6072/24-S304

Key facts

Project type
Planning record
Received
14 Sep 2026
Decision due
6 Nov 2026

Outlook

What happens next

The council's decision is due on 6 Nov 2026. Building work can only follow a grant of permission.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file WEBLRD6072/24-S304 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Dublin City Council planning register, checked 23 Sep 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Dublin 9

Get alerts for Dublin 9Free. We email you when new applications appear.

Free email alerts

Get new Dublin 9 projects by email

New planning applications, decisions and site starts in Dublin 9, Co. Dublin. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options