Planning record · Co. Dublin
A site which previously formed part of the overall RTÉ Campus at Montrose, Donnybrook, Dublin 4
Granted 16 Jan 2026
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 4 by email
Key facts
- Planning application WEBLRD6092/25-S3 at A Site Which Previously Formed Part of The Overall RTÉ Campus At Montrose, Donnybrook, Dublin 4: Site is bounded by the Stillorgan Road.
- It was received by Dublin City Council on 18 Nov 2025.
- Status: Granted 16 Jan 2026.
- Work started on site on 1 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 13 Oct 2026. Open the council's file
More planning applications in Dublin 4 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 16 Jan 2026.
Application details as we last saw them in the national register on 13 Oct 2026.
What and where
Site is bounded by the Stillorgan Road
PROTECTED STRUCTURE: The site is located within the Simmonscourt Townland. The site is bounded by the Stillorgan Road (R138), 4A Stillorgan Road, ‘Belville Mews’, ‘Belville Lodge’, ‘Belville House’ to the west and south-west; RTE Campus to the south-east and east; Ailesbury Close and ‘Belville’ to the north-west; and ‘Danesfield’ and ‘Danesfield Lodge’, Seaview Terrace, ‘Ailesbury Court’, and properties along Ailesbury Road to the north and north-east. ‘Mount Errol’, Protected Structure (RPS 7846), is located within the site. The proposed development will amend permitted Large Scale Residential Development (LRD) ACP Reg. Ref.: 315488-23 (DCC Ref LRD 6003/22-S3). It will consist of alterations to the permitted use and layout of Mount Errol House, a Protected Structure (RPS 7846) and its associated stable outbuilding. The proposed change of use will be from the permitted restaurant/ cafe and retail use to a wellness facility and cafe/ retail use. The proposal will also include the construction of a new single storey (over basement plant room) swimming pool building outside the courtyard walls to the east / southeast of Mount Errol House. It is also proposed to replace the permitted internal vehicular route to the north of Mount Errol and permitted Block 1 with access for pedestrians and cyclists only. All associated works to accommodate the proposed changes, including alterations to permitted open space, surface waste management, visitor cycle parking, and associated ancillary works are included in this application. The remainder of the permitted development, including the site access, site services, and all other works will be delivered as permitted under ACP Reg. Ref.: 315488-23 (DCC Ref LRD 6003/22-S3). A Natura Impact Statement have been prepared in respect of the proposed development. All application documentation and information is available to view online at the following website set up by the applicant: https://www.mounterrolamendmentlrd.com/
- Location
- Dublin 4, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- WEBLRD6092/25-S3
- Application type
- Large Residential Development
Numbers and dates
- Project type
- Planning record
- Received
- 18 Nov 2025
- Granted
- 16 Jan 2026
- Site start
- 1 Sep 2026
- Protected structure
- Yes, RPS 7846
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file WEBLRD6092/25-S3 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Dublin City Council planning register, as last seen on 13 Oct 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 1 Sep 2026Work started · Change of use and extension the existing Mount Errol Protected Structure Building to...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.