Planning application · Co. Dublin

~682 homes, Dublin 17, Co. Dublin

Decision date passed (15 Oct 2026); check the council file

Get updates on this application

We'll email you when the council decides, if the decision is appealed, and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application WEBLRD6102/26-S3 at Dublin 17, Co. Dublin: ~682 homes.
  • The applicant is Glenveagh Homes Ltd. The agent is Rachel Condon.
  • It was received by Dublin City Council on 21 Aug 2026.
  • Status: Decision date passed (15 Oct 2026); check the council file.
  • The decision date (15 Oct 2026) has passed with no decision recorded yet. Check the council file before treating this as live.

Source: the Dublin City Council planning register, checked 21 Oct 2026. Open the council's file

More planning applications in Dublin 17 · Planning applications in Co. Dublin

What and where

~682 homes

PROTECTED STRUCTURE We, Glenveagh Homes Limited intend to apply for Planning Permission for a Large-Scale Residential Development (LRD) on lands (13.86Ha.) located north of the R139 and south of the River Mayne, within the townlands of Belcamp & Balgriffin, Dublin 17. The proposed development seeks a 10-year planning permission for the construction of 682 residential units. The development will consist of: i. The construction of 682 units comprising: a. 109 houses with heights varying from 2-3 storeys; b. 529 apartments across 8 blocks, ?ranging in height from 6-10 storeys, with landscaped areas proposed between the blocks above podium car parking; and c. 44 walk-up apartments, of 3 storeys in height; ii. catering for: a. 4 no. 4-bedroom?units b. 91 no. 3-bedroom?units c. 245 no. 2-bedroom?units d. 230 no. 1-bedroom units e. 112 no. studio units; iii. the removal of four piers fronting the R139; iv. the delivery of a c.397sq.m childcare facility and associated outdoor play space; v. the provision of a c.796sq.m Community Centre and associated padel courts/outdoor amenity areas; vi. public and communal open spaces; vii. the provision of a mobility hub; viii. the delivery of part of a new north south link road to serve the development; ix. the delivery of a new signalised junction and pedestrian crossings across the R139; x. the partial delivery of three pedestrian bridges and a vehicular bridge across the Mayne River to accommodate the north south link road; xi. the provision of a shared pedestrian and cyclist corridor along the southern boundary of the Mayne River located within the site, connecting to the Malahide Road (R107); xii. Works to the R139 to include the delivery of pedestrian and cyclist infrastructure including hedgerow removal; xiii. the undergrounding of existing ESB overhead lines traversing the site; xiv. The reconstruction and removal of part of the southern boundary wall and fence along the R139, where required; xv. all landscaping and planting, infrastructure delivery and connections, car parking, bicycle parking, services, site lighting, bin stores, plant and all associated ancillary development works. The proposed development is within the curtilage of the Protected Structure – Belcamp Hall (RPS: ID 0463), as prescribed by the Fingal County Development Plan 2023-2029. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. All application documentation and information are available for public viewing at the following website set up by the applicant: https://belcamplrddcc.ie/

Location
Dublin 17, Co. Dublin Map
Planning reference
WEBLRD6102/26-S3
Application type
Large Residential Development

Numbers and dates

Homes
~682estimated from the application
Estimated construction value
€110m to €220mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Received
21 Aug 2026
Decision due
15 Oct 2026Date passed; check the council file
Protected structure
Yes

Timeline

  1. Application received
  2. Further information requested

Outlook

What happens next

The decision date (15 Oct 2026) has passed with no decision recorded yet. Check the council file before treating this as live.

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file WEBLRD6102/26-S3 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Dublin City Council planning register, checked 21 Oct 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Dublin 17

Get alerts for Dublin 17Free. We email you when new applications appear.

Free email alerts

Get new Dublin 17 projects by email

New applications, decisions and site starts in Dublin 17, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options