Development Description
permission for the the widened main entrance to accommodate two-way traffic, demolition of an existing outbuilding and construction of a new machinery storage building incorporating public toilet facilities, installation of a proprietary wastewater treatment system, and all associated drainage and site works. Installation of a covered spectator stand. Redevelopment of the existing main pitch to a full-size grass GAA playing field, including pitch fencing and an elevated scoreboard. Conversion of the existing training pitch to a 4G synthetic playing surface with perimeter fencing. Installation of a dedicated pedestrian entrance from the main road to improve access and safety. Development of a perimeter walking trail and associated landscaping works
Map
No coordinates supplied in the public planning feed.