Commercial new build · Co. Galway
Merlin Park Industrial Estate and Doughiska Road, Townland of Doughiska, Galway Co. Galway
Granted 10 Dec 2025 (final grant issued 28 Jan 2026)
Key facts
- Planning application 2560319 at Merlin Park Industrial Estate and Doughiska Road, Townland of Doughiska, Galway City: RED III Permission for development which consists of the construction…
- The agent is Entrust Ltd.
- It was received by Galway City Council on 16 Oct 2025.
- Status: Granted 10 Dec 2025 (final grant issued 28 Jan 2026).
- Permission was granted on 10 Dec 2025 and the final grant issued on 28 Jan 2026. No site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Galway City Council planning register, checked 2 Jun 2026. Open the council's file
What and where
RED III Permission for development which consists of the construction…
RED III Permission for development which consists of: the construction and operation of a development consisting of an energy centre building, heat network pipeline, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Westrock), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 450mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development). Permission is sought for a ten year construction period.
- Location
- Townland Of Doughiska, Co. Galway Map
- Council
- Galway City Council
- Planning reference
- 2560319
- Agent
- Entrust Ltd
Numbers and dates
- Project type
- Commercial new build
- Received
- 16 Oct 2025
- Decision to grant
- 10 Dec 2025
- Final grant
- 28 Jan 2026
Timeline
- Application received
- Decision to grant
- Final grant issued
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2560319 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Galway City Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.