Large residential · Co. Galway

Mincloon, Rahoon road, Galway City

Under appeal since 26 Aug 2026 (Decision to grant 31 Jul 2026 by the council)

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560375 at Mincloon, Rahoon Road, Galway City: ~48 homes.
  • The applicant is Leadlane (Mincloon) Ltd. The agent is Enviroplan Consulting Ltd.
  • It was received by Galway City Council on 11 Dec 2025.
  • Status: Under appeal since 26 Aug 2026 (Decision to grant 31 Jul 2026 by the council).
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Galway City Council planning register, checked 26 Aug 2026. Open the council's file

More planning applications in Galway City · Planning applications in Co. Galway

What and where

~48 homes

Permission is sought by Leadlane (Mincloon) Ltd for the construction of a Residential Development at Mincloon, Rahoon road, Galway City. The development will consist of: 1. Construction of 48 no. own door apartments across 5 no. Duplex building blocks; a. Block 01 consists of a 1-3 storey building, comprising of a 1 no. 2 storey 2 bed apartment, 2 no. 2 bed ground floor apartments, 1 no. 3 bed ground floor apartment, 3 no. 3 bed upper floor apartments, integrated bin store and integrated bike store. b. Block 02 consists of a 3 storey building, comprising of 4 no. 2 bed ground floor apartments, 4no. 3 bed upper floor apartments, integrated bin store and integrated bike store c. Block 03 consists of a 3 storey building, comprising of 5 no. 2 bed ground floor apartments, 5no. 3 bed upper floor apartments. d. Block 04 consists of a 3 storey building, comprising of 6 no. 1 bed ground floor apartments, 1 no. 2 bed ground floor apartment, 7no. 2 bed upper floor apartments, 1no. 3 bed upper floor apartment, integrated bin store and integrated bike store. e. Block 05 consists of a 3 storey building, comprising of 4 no. 2 bed ground floor apartments, 4no. 3 bed upper floor apartments, integrated bin store and integrated bike store. 2. Upgrading of existing vehicular entrance and access road including road setback along Rahoon road frontage and provision of footpaths, 3. Establishment of a right of way across the site to also serve an existing house to the south-west of the site (Eircode H91ECC6), 4. Revised boundary treatment and revised site boundaries, 5. Partial demolition of existing shed, 6. Provision of public open space areas (to include for play spaces), private open space areas, bicycle parking, footpaths, public lighting, hard and soft landscaping, 7. Car parking including dedicated EV charge spaces, ducting to all spaces for future electric charging points, 8. Proposed connection to existing mains water infrastructure, and on-site surface water drainage arrangements, 9. Proposed connection to sewer network including provision for on-site pumping station, together with all associated site works and services. A Natura Impact Statement will be submitted to the planning authority with this application

Location
Galway City, Co. Galway Map
Planning reference
2560375
Applicant
Leadlane (Mincloon) Ltd

Numbers and dates

Homes
~48estimated from the application
Estimated construction value
€9.1m to €13mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Project type
Large residential
Received
11 Dec 2025
Council decision
31 Jul 2026
Appeal lodged
26 Aug 2026

Timeline

  1. Application received
  2. Decision to grant by the council
  3. Appeal lodged

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

Reviewed build intelligence

What the documents establish

Government document review

The council decision to grant permission for 48 apartments is under appeal. The 2025 lighting proposal names fittings, while the July 2026 decision requires further lighting and materials approval. These records do not establish final permission, appointed suppliers or installed products.

3 official documents inspected · Checked 2026-09-05 · Official file index

The original lighting report names 25 AXIA fittings

Historical 2025 proposal; later lighting approval unverified · September 2025 lighting design submitted with the original Mincloon application; later approved design not verified

What the evidence says
The September 2025 design lists Urbis Schréder AXIA 3 EVO 1 fittings: type A 6, type B 11 and type C 8, totalling 25. Its layout lists 6 m mounting heights.

The report describes a desktop design. The later council decision requires lighting-design approval; the final fitting list, colour temperature, procurement and installation are not established.

Why it may matter — interpretation
This identifies a specific historic product proposal to compare with any later approved lighting schedule.

What is not established
The report describes a desktop design. The later council decision requires lighting-design approval; the final fitting list, colour temperature, procurement and installation are not established.

Inspect the evidence

Mincloon Outdoor Lighting Report · p.2
Luminaire A, B and C schedules · Issued 2025-09-16 · Project R0; dated 16 September 2025, stamped received 11 December 2025; original proposal, later approved design unverified · Checked 2026-09-05

AXIA 3 EVO 1

Mincloon Outdoor Lighting Report · p.3
Layout continued · Issued 2025-09-16 · Project R0; dated 16 September 2025, stamped received 11 December 2025; original proposal, later approved design unverified · Checked 2026-09-05

6.00

The council requires a further lighting design

July 2026 council requirement; appeal pending · Galway City 2560375 council decision to grant, dated 31 July 2026; under pending appeal 501977

What the evidence says
Condition 17 requires written approval of a lighting design that accounts for existing public-lighting infrastructure and the surrounding area before development begins.

Appeal 501977 is pending. An approved compliance submission and the final lighting products have not been inspected.

Why it may matter — interpretation
This prevents the older product schedule from being treated as the final approved specification.

What is not established
Appeal 501977 is pending. An approved compliance submission and the final lighting products have not been inspected.

Inspect the evidence

25/60375 Notification of decision to grant · p.7
Condition 17 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

submit for written approval a lighting design

The council specifies glazing and finish requirements

July 2026 council requirement; appeal pending · Galway City 2560375 council decision to grant, dated 31 July 2026; under pending appeal 501977

What the evidence says
Conditions 3–6 require obscure first-floor bathroom glazing with top-hung openings, black roofs, agreed stone/brick finishes and concrete boundary walls. Balcony railings must change to agreed glazing or block finishes.

These are appealed council requirements. Specific material products, agreed samples and installed finishes are not established.

Why it may matter — interpretation
The conditions point to concrete glazing and materials evidence to obtain from later compliance documents.

What is not established
These are appealed council requirements. Specific material products, agreed samples and installed finishes are not established.

Inspect the evidence

25/60375 Notification of decision to grant · p.3
Conditions 3–5 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

glazed in obscure glass

25/60375 Notification of decision to grant · p.4
Condition 6 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

glazing or block finish

Independent drainage audits are required

July 2026 council requirement; appeal pending · Galway City 2560375 council decision to grant, dated 31 July 2026; under pending appeal 501977

What the evidence says
Condition 7 requires a Stage 2 storm-water audit before construction and Stage 3 after construction, using an engineer independent of the design team, plus council drainage records when complete.

This is a dated requirement, not evidence that either audit or construction has happened; the appeal remains pending.

Why it may matter — interpretation
The drainage response can be followed into the council condition and later independent audit records.

What is not established
This is a dated requirement, not evidence that either audit or construction has happened; the appeal remains pending.

Inspect the evidence

25/60375 Drainage FI response · p.1
Drainage requirements · Issued 2026-07-21 · Council drainage response dated 21 July 2026; requirements incorporated into Condition 7 of the 31 July decision · Checked 2026-09-05

A Stage 2 audit is required

25/60375 Notification of decision to grant · p.4
Condition 7 · Issued 2026-07-31 · Chief Executive order PL.26.0646; Condition 1 incorporates revised details received 15 May 2026; appealed, not a final grant · Checked 2026-09-05

A Stage 3 audit is required
Remaining document questions
  • Inspect the May 2026 revised design and any subsequent approved lighting and materials submissions.
  • Follow the pending Commission appeal 501977 before treating the council conditions as the final permission.
  • Verify commencement and installed details independently; this review does not establish either.

Three government-hosted PDFs inspected through the exact Galway City 2560375 viewer. Selected pages establish an older lighting proposal and dated council requirements. The May 2026 revised drawing set and the appeal file have not been fully reviewed; later product or design changes remain unverified.

How we know this

From the Galway City Council planning register, checked 26 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Galway City

Get alerts for Galway CityFree. We email you when new applications appear.

Free email alerts

Get new Galway City projects by email

New applications, decisions and site starts in Galway City, Co. Galway. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options