Public / civic, Garbally Demesne, Portiuncula University Hospital, Ballinasloe
for a new Emergency Department extension covering 310 sq metres of single storey extension with rooftop plant room and internal refurbishment of the existing department. At the existing lower ground floor level, a new public entrance lobby with security room will be formed adjacent a reconfigured ambulance drop-off and...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 2 Dec 2025. / Confidence: LowDecision date 2 Dec 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for a new Emergency Department extension covering 310 sq metres of single storey extension with rooftop plant room and internal refurbishment of the existing department. At the existing lower ground floor level, a new public entrance lobby with security room will be formed adjacent a reconfigured ambulance drop-off and set-down area. The extension will provide 9 new patient cubicles, including gynaecology treatment room and associated staff and clinical support facilities. The extension will link into the...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Galway County Council
- Exact reference
- 2561096
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Public / civic
The public application record identifies public / civic in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Galway planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for a new Emergency Department extension covering 310 sq metres of single storey extension with rooftop plant room and internal refurbishment of the existing department. At the existing lower ground floor level, a new public entrance lobby with security room will be formed adjacent a reconfigured ambulance drop-off and set-down area. The extension will provide 9 new patient cubicles, including gynaecology treatment room and associated staff and clinical support facilities. The extension will link into the existing building by way of a new accessible reception, leading to a newly formed dedicated paediatric waiting area and WC. The existing emergency department will undergo a series of phased internal refurbishment works to provide modernised staff changing facilities, additional patient treatment cubicles and reconfigured storage and staff support facilities. The works will include a reconfiguration of the existing internal campus 2-way traffic flow to become a 1-way traffic flow in the vicinity of the Emergency Department extension, formation of a new accessible set-down area, reconfigured ambulance drop-off areas and works to form a new pedestrian crossing and improve accessibility and safety around the immediate site. Drainage, water, and electrical utility connections will be made within the campus to the existing site infrastructure, and all other ancillary site works as required to facilitate the project
Application to site progress
-
Applied 11 Aug 2025 2561096
-
Decision Conditional 2 Dec 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2561096
for a new Emergency Department extension covering 310 sq metres of single storey extension with rooftop plant room and internal refurbishment of the existing department. At the existing lower ground floor level, a new public entrance lobby with security room will be formed adjacent a reconfigured ambulance drop-off and set-down area. The extension will provide 9 new patient cubicles, including gynaecology treatment room and associated staff and clinical support facilities. The extension will link into the existing building by way of a new accessible reception, leading to a newly formed dedicated paediatric waiting area and WC. The existing emergency department will undergo a series of phased internal refurbishment works to provide modernised staff changing facilities, additional patient treatment cubicles and reconfigured storage and staff support facilities. The works will include a reconfiguration of the existing internal campus 2-way traffic flow to become a 1-way traffic flow in the vicinity of the Emergency Department extension, formation of a new accessible set-down area, reconfigured ambulance drop-off areas and works to form a new pedestrian crossing and improve accessibility and safety around the immediate site. Drainage, water, and electrical utility connections will be made within the campus to the existing site infrastructure, and all other ancillary site works as required to facilitate the project
Open official record