Planning application · Co. Galway

Shessy North Shessy South Lydacan South, South Galway, Co. Galway

Granted 18 Nov 2025 by the council; appealed to An Coimisiún Pleanála

Key facts

  • Planning application 2561380 at Shessy North Shessy South Lydacan South, South Galway, Co. Galway: Proposed solar farm development.
  • The applicant is Bnrg Shessy Ltd. The agent is Lauren Shinkwin.
  • It was received by Galway County Council on 24 Sep 2025.
  • Status: Granted 18 Nov 2025 by the council; appealed to An Coimisiún Pleanála.
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Galway County Council planning register, checked 4 Oct 2026. Open the council's file

Planning applications in Co. Galway

What and where

Proposed solar farm development

for a proposed solar farm development consisting of: linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting; 12 no. proposed single storey MV stations; 1 no. Battery Energy Storage System (BESS) installation (including 32 no. containers with cells and 8no. Power Conversion System (PCS) MV Stations) with associated security fencing and gates; Site perimeter fencing; 4 no. new permanent site entrances, 1 no. new temporary site entrance, 1 no. upgrade to an existing site entrance; Security gates at all permanent and temporary access points; Site access tracks including passing and turning bays; 3 no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; 6 no. steel storage containers; 6 no. turning bays; On-site pole mounted CCTV cameras; 3 no. temporary construction stage Moby Dick type wheel wash systems; 3 no. concrete wash out locations (one within each temporary construction compound); and, all associated and ancillary works. The proposed solar farm development spans a total site area measuring 86.3ha. Permission is sought for a period of 10 years with an operational period of 40 years. The export capacity to the grid is estimated to be up to 70 MW. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. The planning application including the AASR and NIS

Description as published by the council. Its text starts part-way through a sentence.

Location
Co. Galway Map
Planning reference
2561380
Application type
Permission
Applicant
Bnrg Shessy Ltd
Agent
Lauren Shinkwin
Council planning fileGet alertsDownload PDF

Numbers and dates

Received
24 Sep 2025
Council decision
18 Nov 2025

Timeline

  1. Application received
  2. Granted by the council
  3. Appeal lodged

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Galway County Council planning register, checked 4 Oct 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Co. Galway

Get alerts for Co. GalwayFree. We email you when new applications appear.

Free email alerts

Get new Galway projects by email

New applications, decisions and site starts in Co. Galway. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options