Infrastructure, Bunowen, Killary Fjord, Leenane, Co. Galway
for a floating jetty for landing aquatic produce. It would consist of an interlocking precast concrete block structure 5 metres wide, extending 5 metres into the sea from the existing concrete pier. Connected to this would be a Bailey type galvanised steel bridge 3 metres wide and 15 metres long leading to a floating pontoon...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
No near-term procurement timing is inferred from a refused planning decision.
REFUSED / Confidence: High for planning stateDecision recorded 23 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for a floating jetty for landing aquatic produce. It would consist of an interlocking precast concrete block structure 5 metres wide, extending 5 metres into the sea from the existing concrete pier. Connected to this would be a Bailey type galvanised steel bridge 3 metres wide and 15 metres long leading to a floating pontoon raft 10 metres by 5 metres in size. The structure would be 25 metres long and would have a footpring of 120 square metres. A Natura Impact Statement will be included in the application
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 1 official source
- Authority
- Galway County Council
- Exact reference
- 2661330
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Simon and Ivan Kennedy
- Planning agent
- Ciaran Flynn
- Agent address
- 150 Bluebell woods Oranmore Co. Galway H91R5D6
More Galway planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for a floating jetty for landing aquatic produce. It would consist of an interlocking precast concrete block structure 5 metres wide, extending 5 metres into the sea from the existing concrete pier. Connected to this would be a Bailey type galvanised steel bridge 3 metres wide and 15 metres long leading to a floating pontoon raft 10 metres by 5 metres in size. The structure would be 25 metres long and would have a footpring of 120 square metres. A Natura Impact Statement will be included in the application
Application to site progress
-
Applied 30 Jul 2026 2661330
-
Decision Refused 23 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed This planning record has no linked public commencement evidence.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2661330
for a floating jetty for landing aquatic produce. It would consist of an interlocking precast concrete block structure 5 metres wide, extending 5 metres into the sea from the existing concrete pier. Connected to this would be a Bailey type galvanised steel bridge 3 metres wide and 15 metres long leading to a floating pontoon raft 10 metres by 5 metres in size. The structure would be 25 metres long and would have a footpring of 120 square metres. A Natura Impact Statement will be included in the application
Open official record