Development Description
CONSIST OF (1) A NEW FOUL SEWER TO FACILIATE IRISH WATER IN THE COMPLETION OF THE KILCUMMIN SEWAGE SCHEME AND THE CONNECTION OF PÁIRC CHUIMIN TO SAME. (2) THE PROVISION OF A TURNING BAY TO SERVE THE PERMITTED PUMPING STATION (GRANTED UNDER PLANNING REFERENCE 17/97). (3) THE CONSTRUCTION OF 34 NO. HOUSES BY WAY OF MODIFICATION TO THE PREVIOUSLY GRANTED PERMITTED PERMISSION BY AN BORD PLEANÁLA UNDER APPEAL REFERENCE 08.248967 (P.A. REG. REF. 16/247). THE DEVELOPMENT WILL CONSIST OF 4 NO. TYPE E TWO STOREY TERRACED, 3-BED DWELLING HOUSES, 3 NO. TYPE D, TWO STOREY 3 BED SEMI DETACHED DWELLING HOUSES, 3 NO. TYPE B TWO STOREY, 3 BED SEMI DETACHED DWELLING HOUSES AND 24 NUMBER SEMI-DETACHED HOUSES THAT WILL BE INTERCHANGEABGLE AS TO THEIR TYPE, BEING EITHER A TYPE B, TWO STOREY, 3 BED SEMI-DETACHED OR A TYPE C, TWO AND A HALF STOREY, 4 BED SEMI-DETACHED WITH HOME OFFICE SPACE AND BEDROOM/TV ROOM IN A CONVERTED ATTIC, ALL ASSOCIATED PARKING AND SITE DEVELOPMENT WORKS AND SERVICES