~1 dwelling, Tralee, Kerry - Planning Application 2360295

Kerry / Tralee / Tralee, Kerry

Est. value €30m+
Units 1
Floor area 19,989 m²
Commenced 28 Mar 2025

Source-linked planning record

~1 dwelling, Tralee, Kerry - Planning Application 2360295

Kerry / Tralee / Tralee, Kerry
PB ref
PB-286290
Plan ref
2360295
Authority
Kerry County Council
Stage / date
Commencement / 28 Mar 2025
Est. value band
€30m+
Units / floor
1 / 19,989 m²
Project class
One-off house
Promoter
not available yet
Architect / agent
not available yet

Source: http://www.eplanning.ie/KerryCC/AppFileRefDetails/2360295/0

Key facts

Lead summary

Source
Owner-supplied commencement export
Planning authority
Kerry County Council
Application reference
2360295
Applicant
not available yet
Agent
not available yet
Decision stage
Commencement
Commenced
28 Mar 2025
Units
1
Floor area
19,989 m²

Official description

Verbatim source text

See site notice for full description. Below is a brief description set to the character limit of the Planning Portal. Astellas Ireland Co., Ltd., intend to apply for permission for development of a pharmaceutical ‘Fill-Finish’ production facility over two construction phases. The application seeks a 10 year duration of planning permission. The proposed development will include: (i) a 3 storey pharmaceutical ‘Fill-Finish’ Production Building with an overall total building floor area of 19,989 m² and maximum height to roof parapet of approximately 24.63m constructed over 2 no. phases. (ii) a Central Utilities Building (CUB) with floor area of 663 m² and maximum height to roof parapet of approximately 10.135m to include vent outlets. (iii) A Woodchip Boiler Building constructed in Phase 1, with a floor area of 359 m² and maximum height to roof parapet of 9.26m to include 2 no. flues. (iv) Electrical Switch Room and ESB Sub-Station Building constructed in Phase 1, with a floor area of 37 m² and maximum height to roof parapet of approximately 2.965m; (v) a Security Office Building constructed in Phase 1, with floor area of 63 m² and maximum height to roof parapet of approximately 4.965m; (vi) a Sprinkler Pump House constructed in Phase 1, with floor area of 40 m² and maximum height to parapet of approximately 4.21m with associated Sprinkler Water Tank; (vii) a Waste Water Pre-Treatment Plant, with 1 no. associated storage tank constructed in Phase 1 and a second associated storage tank constructed in Phase 2; (viii) Utilities and Services Yard (ix) Site infrastructure works (x) Site boundary fencing and site landscaping; (xi) A temporary contractor’s compound and parking area for the duration of the construction works. The applicant also intends to submit a concurrent planning application to alter electrical cable infrastructure on adjoining and overlapping lands. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Verify against official source

Project team

Named source parties

Promoter
not available yet
Planning agent
not available yet

Lifecycle timeline

Application to site progress

  1. Applied

    28 Mar 2025 2360295
  2. Decision

    Commencement notice filed 19 Dec 2023
  3. Appeal

    No appeal indexed No public appeal record is indexed against this application.
  4. Commenced

    11 Jun 2024 CN0116223KY
  5. Completed

    Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.