Temporary/event, Kerry Technology Park, Dromthacker, Tralee
PERMISSION for amendments and alterations to the approved pharmaceutical ‘Fill-Finish’ production facility permitted under planning register 23/60295 (10-year duration of permission), i. Construction of a dual fire water retention / attenuation pond (c. 4,500m3), and an additional smaller surface water attenuation (150m3) pond...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 24 Oct 2024. / Confidence: LowDecision date 24 Oct 2024.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
PERMISSION for amendments and alterations to the approved pharmaceutical ‘Fill-Finish’ production facility permitted under planning register 23/60295 (10-year duration of permission), i. Construction of a dual fire water retention / attenuation pond (c. 4,500m3), and an additional smaller surface water attenuation (150m3) pond with a combined site area of approximately 2,250 m² to include a 1.2m high perimeter fence. ii. Adjustments to positioning and layout of the approved car park to facilitate the proposed...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kerry County Council
- Exact reference
- 2460694
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Temporary/event
The public application record identifies temporary/event in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Kerry planning activity
These are county discovery links, not claimed relationships to this application.
Application text
PERMISSION for amendments and alterations to the approved pharmaceutical ‘Fill-Finish’ production facility permitted under planning register 23/60295 (10-year duration of permission), i. Construction of a dual fire water retention / attenuation pond (c. 4,500m3), and an additional smaller surface water attenuation (150m3) pond with a combined site area of approximately 2,250 m² to include a 1.2m high perimeter fence. ii. Adjustments to positioning and layout of the approved car park to facilitate the proposed pond, with no change in total number of permitted spaces. iii. Adjustments to the approved internal road layout to include set-down area and turning circle. iv. Permanent permission for the existing 2.4m high temporary construction security fence in place of approved fencing at the northern boundary of the site. v. Associated works include re-alignment of the approved site drainage, adjustments to site levels and adjustments to the approved landscape plan.
Application to site progress
-
Applied 16 Sep 2024 2460694
-
Decision Conditional 24 Oct 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460694
PERMISSION for amendments and alterations to the approved pharmaceutical ‘Fill-Finish’ production facility permitted under planning register 23/60295 (10-year duration of permission), i. Construction of a dual fire water retention / attenuation pond (c. 4,500m3), and an additional smaller surface water attenuation (150m3) pond with a combined site area of approximately 2,250 m² to include a 1.2m high perimeter fence. ii. Adjustments to positioning and layout of the approved car park to facilitate the proposed pond, with no change in total number of permitted spaces. iii. Adjustments to the approved internal road layout to include set-down area and turning circle. iv. Permanent permission for the existing 2.4m high temporary construction security fence in place of approved fencing at the northern boundary of the site. v. Associated works include re-alignment of the approved site drainage, adjustments to site levels and adjustments to the approved landscape plan.
Open official record